Quantcast
Last updated on April 24, 2014 at 5:30 EDT
Ares V Model Testing
403 of 511

Ares V Model Testing

July 2, 2009
Oct. 28, 2008 -- Henry Brewster, left, aerospace engineering technician in the Marshall Center's Test Laboratory Department, and Victor Pritchett, aerospace engineer in the Spacecraft and Vehicle Systems Department, prepare the Ares V model for wind tunnel testing at Building 4732 at the Marshall Center.