Capstone Completes Minto Mine Phase VI Pre-Feasibility Study

June 18, 2012

Study extends mine life to 2022 with yearly average copper production of
40 million pounds at an average cash cost of $1.92/lb of payable copper

VANCOUVER, June 18, 2012 /PRNewswire/ – Capstone Mining Corp. (“Capstone”)
(TSX: CS) today announced the results of the Phase VI Pre-Feasibility
Study (“Phase VI PFS”) for its Minto copper-gold mine in Yukon.

This study was initiated to apply economic considerations to the Minto
South Deposit (“MSD”) mineral resource and more specifically extensions
to that deposit called Copper Keel and Wildfire in order that it may be
converted to a National Instrument 43-101 compliant (“NI 43-101″)
Mineral Reserve.  The study builds on the previous Minto Phase V
Pre-Feasibility Study (“Phase V PFS”) by incorporating new mineral
reserves and a new life-of-mine plan (“LOMP”) that includes the
additional underground mineral reserves from the Copper Keel and
Wildfire zones; optimized pit designs; processing plant capacity
improvements; updated costs and economic analysis.

Highlights
(all amounts in Canadian dollars unless otherwise indicated)

        --  Mine life extended to 2022 with an average of 40 million pounds
            of copper production per year;
        --  Net present value ("NPV"), at a constant US$3.25/pound copper
            price and a 8.0% discount rate, of $278 million before tax and
            $192 million after tax;
        --  Proven and probable open pit and underground mineral reserves
            have increased to 14.4 million tonnes grading 1.53% copper,
            0.58 grams/tonne gold, and 5.12 grams/tonne silver, for a
            contained 484 million pounds of copper, 270,000 ounces of gold,
            and 2.4 million ounces of silver;
        --  Life-of-mine ("LOM") capital cost of $103 million; and
        --  Life-of-mine cash costs(1) of US$1.92/pound of payable copper,
            after by-product credits (with gold at US$300/ounce and silver
            at US$3.90/ounce, as per an agreement with Silver Wheaton).
        --  Key Performance Indicators associated with the addition of
            underground mineral reserves at Copper Keel and Wildfire on an
            after tax basis is an NPV8% of $15 million with an IRR of 31%
            and capex at $25 million based on an NSR cut-off of C$64.40 per
            tonne.

(1) The items marked with a “1″ are alternative performance measures;
please see “Alternative Performance Measures” at the end of this
release.  

“The Minto Mine has been very successful as the Yukon’s first operating
hard rock mine since the 1990′s, bringing stable long-term employment
and royalty benefits to the Yukon.  It started operations in 2007 at
1,600 tonnes per day with an eight year mine life, and now, five years
later, as a result of successful exploration this latest study and
development plan extends the mine life to 2022 at a proposed production
rate of 3,750 tonnes per day,” said Darren Pylot, President and CEO of
Capstone.  ”In addition, exploration on the Minto property remains
on-going to further define and potentially expand the mineral
resources, as well as explore additional new zones of mineralization.”

Phase VI PFS
The Phase VI PFS was compiled by Capstone with contributions from SRK
Consulting (Canada) Inc. (“SRK”) for block model validation as well as
open-pit and underground geotechnical evaluations; Genivar Inc.
(“Genivar”) for site infrastructure revisions and ventilation
modelling; and Eggert Consulting for information related to metallurgy
and mineral processing.

For the purposes of the Phase VI PFS the Area 2, Area 118, Copper Keel,
and Wildfire resource sub-domains are now considered continuous, and
reported as one deposit, namely Minto South Deposit located immediately
south of the Minto Main Pit.  The Ridgetop deposit is separate from MSD
and is located just over 300 metres south of the MSD sub-domain Area
2/118.  The Minto North deposit is located approximately 700 metres
north of the Minto Main deposit and the Minto East Deposit is located
approximately 200 metres east of the south end of the Minto Main
deposit.  Two recent discoveries, named Fireweed A and Fireweed B are
located approximately 200 metres and 400 metres respectively due east
from Minto East.  A working model suggests that the Fireweed zones may
be structurally offset from Minto East and it remains a priority
exploration target.  These deposits and other mineral prospects
collectively define a general north-northwest trend informally called
the Priority Exploration Corridor.

In conjunction with the Phase VI PFS, an internal scoping level
evaluation was completed to assess the viability of a larger scale
mining and milling operation incorporating more of the lower grade
mineral resources in the MSD.  This evaluation concluded that there was
a poor risk/reward ratio of the large scale operating scenario as
compared to the Phase VI PFS and therefore recommended that further
studies investigating a major increase in the production rate with a
subsequent decrease in unit operating costs should not be pursued at
this time.

Mineral Resources
A primary objective of the Phase VI PFS was to produce a revised mineral
resource for the MSD by including new drill results in the MSD area not
incorporated in, or obtained subsequent to the Phase V study.  The new
MSD model uses all of the previous drill data plus newly acquired
diamond drill results updated to a cut-off date of July 16, 2011.
 Exploration drilling since the July 16, 2011 cut-off is not included
in the Phase VI PFS and a future mineral resource update is in progress
with an anticipated completion in late 2012.  There were no
modifications to the Minto North and Ridgetop mineral resource
estimates.

The following table presents combined mineral resources at a 0.5% Cu
cut-off for MSD, Ridgetop, Minto Main, Minto North and Minto East
Deposits.  The Minto Main Deposit mineral resource has been
appropriately reduced to account for all material removed by mining up
until December 31, 2011.

Combined Mineral Resource Statement at 0.5% Cu Cut-off for Minto South,
Ridgetop, Minto Main, Minto North and Minto
East Deposits, January 1, 2012

     _______________________________________________________________________
    |              |      |      |     |      |Contained|Contained|Contained|
    |Classification|Tonnes|Copper|Gold |Silver| Copper  |  Gold   | Silver  |
    |              | (Kt) | (%)  |(g/t)|(g/t) | (000's  | (000's  | (000's  |
    |              |      |      |     |      |  lbs)   |   oz)   |   oz)   |
    |______________|______|______|_____|______|_________|_________|_________|
    | Measured (M) |14,828| 1.35 |0.53 | 4.43 | 441,744 |    254  |   2,114 |
    |______________|______|______|_____|______|_________|_________|_________|
    |Indicated (I) |33,103| 0.98 |0.32 | 3.42 | 714,010 |    341  |   3,643 |
    |______________|______|______|_____|______|_________|_________|_________|
    |   Sub-total  |47,931| 1.09 |0.39 | 3.73 |1,155,754|    595  |   5,758 |
    |     (M+I)    |      |      |     |      |         |         |         |
    |______________|______|______|_____|______|_________|_________|_________|
    |   Additional |8,493 | 0.81 |0.24 | 2.88 | 151,764 |     65  |    788  |
    |    Inferred  |      |      |     |      |         |         |         |
    |______________|______|______|_____|______|_________|_________|_________|

In the opinion of SRK, Kirkham Geosystems Ltd. and Capstone, the block
model resource estimate and resource classification reported herein are
a reasonable representation of the mineral resources at MSD, Ridgetop,
Minto Main, Minto North and Minto East Deposits at the current level of
sampling.  The mineral resources presented herein have been estimated
in conformity with generally accepted CIM “Estimation of Mineral Resource and Mineral Reserves Best Practices” guidelines and are reported in accordance with Canadian Securities
Administrators’ NI 43-101.  Mineral resources are not mineral reserves
and do not have demonstrated economic viability.  Only Measured and
Indicated mineral resources have been used in the preliminary
feasibility study described in this news release and the Phase VI PFS
report.

The database used to estimate the MSD was audited by Capstone/SRK and
the mineralization boundaries were modelled by SRK based on
lithological and structural interpretations.  Kirkham Geosystems Ltd.
audited the Minto North and Minto East database and modelled
mineralization boundaries.  The Minto North and Minto East Deposit
mineral resource estimates were completed by Garth Kirkham, P.Geo., of
Kirkham Geosystems Ltd., an independent qualified person as this term
is defined in NI 43-101. These mineral resource estimates were
completed as part of the Phase V PFS and have not changed.  The mineral
resource estimate of MSD was completed by Dr. Wayne Barnett, Ph.D.,
Pr.Sci.Nat., a NI 43-101 independent qualified person.  The effective
date of this mineral resource estimate is October 17, 2011. Marek
Nowak, P.Eng, analyzed the data, reviewed and validated the mineral
resource estimates.

SRK is of the opinion that the current drilling information is
sufficiently reliable to interpret with confidence the boundaries of
the mineralized domains and that the assaying data is sufficiently
reliable to support estimating mineral resources.

The “reasonable prospects for economic extraction” requirement for a
mineral resource generally implies that the quantity and grade
estimates meet certain economic thresholds, and that the mineral
resources are reported at an appropriate cut-off grade taking into
account extraction scenarios and processing recoveries.  Capstone
considers that the Ridgetop and Minto North resource areas are amenable
for open pit extraction.  The Area 2/118 and Wildfire subdomains of the
MSD resource is amendable to combined open pit and underground
extraction while the Minto East Deposit and Copper Keel subdomain of
the MSD resource will be extracted by underground mining.

Mine Production and Mineral Reserve Estimation
The MSD, Ridgetop, Minto East and Minto North Deposits are planned to be
developed by open pit (“OP”) and underground (“UG”) methods.  Open Pit
mining in the Phase VI PFS study assumes contractor mining rather than
the owner operated scenario proposed in the Phase V PFS.  In addition,
the initial underground mining (portal and decline development as well
as the vertical ventilation raise development) is also by contractor
rather than owner operated as indicated in the Phase V PFS.  The Phase
VI PFS also assumes underground mine production mining and the
remaining capital development will be owner operated commencing in the
fourth quarter of 2013.

The Phase VI PFS assumes a start date of January 1, 2012.  Mining of the
Main Pit was completed in April 2011 and can therefore be utilized as
an in-pit tailings deposition storage location.  Pre-stripping of the
Area 2 Open Pit within the MSD commenced in 2011.

Based on a start date of January 1, 2012, the Phase VI open pit and
underground mines will produce a total of 13.5 million tonnes (“Mt”) of
ore and 44.48 Mt of waste over approximately a seven year mine
operating life ending in 2019.  Approximately 4.36 Mt of ore is planned
to be produced from UG mining at a rate of 2,000 tpd. The LOMP
accelerates mining and processing of high-grade ore and defers
stockpiled lower grade mill feed until the end of the mine life
whenever possible.  Once active mining is completed, mill operations
will continue for an additional three years, processing the accumulated
4.08 Mt of stockpiled ore.  Therefore, the total mill operating life is
10 years with final reclamation commencing mid-2022.

Mine design for the Phase VI underground expansion relies on the
evaluation of a NSR model that includes estimates of metal prices,
exchange rate, mining dilution, mill recovery, concentrate grade
smelting and refining payables and costs, freight and marketing costs
and royalties.  The NSR model was based on a 10 metre x 10 metre x 3
metre block size (see below).

The Phase V pit designs, and subsequently the open pit mineral reserves,
have been revised in the Phase VI PFS to reflect LOMP operating costs,
metal prices and the exploration results contained with the Minto South
Deep ore deposit model.  The table below reviews the Whittle(TM)
Parameters utilized to generate pit economic shells.  These shells were
used to develop optimized pit designs.

Summary of Whittle(TM) Parameters used for Phase VI Open Pit Design

     __________________________________________________________________
    |Item                           |        Unit   |         Value    |
    |_______________________________|_______________|__________________|
    |Metal Prices and Exchange Rate                                    |
    |__________________________________________________________________|
    |Copper                         |      US$/lb   |          2.50    |
    |_______________________________|_______________|__________________|
    |Gold*                          |      US$/oz   |         300.00   |
    |_______________________________|_______________|__________________|
    |Silver*                        |      US$/oz   |          3.90    |
    |_______________________________|_______________|__________________|
    |Exchange rate                  |      US$/C$   |          0.90    |
    |_______________________________|_______________|__________________|
    |Processing                                                        |
    |__________________________________________________________________|
    |Copper recovery to concentrate |         Max   |           91%    |
    |_______________________________|_______________|__________________|
    |Sulphide Gold recovery to      |         Max   |           70%    |
    |concentrate                    |               |                  |
    |_______________________________|_______________|__________________|
    |Sulphide Silver recovery to    |         Max   |           78%    |
    |concentrate                    |               |                  |
    |_______________________________|_______________|__________________|
    |Copper grade in concentrate    |          %    |            40    |
    |_______________________________|_______________|__________________|
    |Gold grade in concentrate      |         g/t   | variable with Cu |
    |_______________________________|_______________|__________________|
    |Silver grade in concentrate    |         g/t   | variable with Cu |
    |_______________________________|_______________|__________________|
    |Concentrate moisture content   |               |            8%    |
    |_______________________________|_______________|__________________|
    |Smelter Payables                                                  |
    |__________________________________________________________________|
    |Payable copper in concentrate  |          %    |         96.75    |
    |_______________________________|_______________|__________________|
    |Payable gold in concentrate    |          %    | per MRI contract |
    |_______________________________|_______________|__________________|
    |Silver deduction               |   g/t in conc | per MRI contract |
    |_______________________________|_______________|__________________|
    |Remaining payable silver in    |          %    | per MRI contract |
    |concentrate                    |               |                  |
    |_______________________________|_______________|__________________|
    |Other Parameters                                                  |
    |__________________________________________________________________|
    |Pit slope angles               |      Overall  |As per Phase V PFS|
    |_______________________________|_______________|__________________|
    |Dilution                       |          %    |            6%    |
    |_______________________________|_______________|__________________|
    |Mining recovery                |          %    |           100    |
    |_______________________________|_______________|__________________|
    |Annual Plant Throughput        |        Mtpa   |      1,370,000   |
    |_______________________________|_______________|__________________|
    |Costs                                                             |
    |__________________________________________________________________|
    |Waste mining cost              |C$/waste tonne |          3.12    |
    |_______________________________|_______________|__________________|
    |Ore mining cost                |  C$/ore tonne |          3.12    |
    |_______________________________|_______________|__________________|
    |Processing cost                |C$/milled tonne|         16.50    |
    |_______________________________|_______________|__________________|
    |G&A cost                       |C$/milled tonne|         11.90    |
    |_______________________________|_______________|__________________|
    |Royalties                      |          %    |         1.00%    |
    |_______________________________|_______________|__________________|
    |Transport, marketing, ins, etc.|  US$/dmt conc |         169.54   |
    |_______________________________|_______________|__________________|

*Based on terms of royalty stream agreement with Silver Wheaton

The Phase V Underground mineral reserves in the areas of Minto East,
Area 2 and 118 were checked with the revised NSR model and remain
economically viable.  Therefore, these mineral reserves were included
in the Phase VI mineral reserves without revision.

The additional Phase VI underground mineral reserves are located in the
Copper Keel and Wildfire regions of MSD and were estimated using the
following NSR model.

Underground Net Smelter Return Parameters

     ________________________________________________________________
    |                Parameter      |        Unit   |        Value   |
    |_______________________________|_______________|________________|
    |Metal Prices and Exchange Rate                                  |
    |________________________________________________________________|
    |Cu price                       |    US$/lb Cu  |            2.50|
    |_______________________________|_______________|________________|
    |Au price                       |    US$/oz Au  |             300|
    |_______________________________|_______________|________________|
    |Ag price                       |    US$/oz Ag  |            3.90|
    |_______________________________|_______________|________________|
    |Exchange rate                  |      US$/C$   |            0.90|
    |_______________________________|_______________|________________|
    |                                        Processing              |
    |________________________________________________________________|
    |Cu                             |          %    |              91|
    |_______________________________|_______________|________________|
    |Au                             |          %    |              70|
    |_______________________________|_______________|________________|
    |Ag                             |          %    |              78|
    |_______________________________|_______________|________________|
    |                                 Cu Concentrate Grade           |
    |________________________________________________________________|
    |Cu                             |          %    |              40|
    |_______________________________|_______________|________________|
    |Au                             |         g/t   |        Variable|
    |_______________________________|_______________|________________|
    |Ag                             |         g/t   |        Variable|
    |_______________________________|_______________|________________|
    |Moisture content               |          %    |               8|
    |_______________________________|_______________|________________|
    |                                    Smelter Payables            |
    |________________________________________________________________|
    |Cu in Cu conc                  |          %    |           96.75|
    |_______________________________|_______________|________________|
    |Au in all cons                 |          %    |per MRI contract|
    |_______________________________|_______________|________________|
    |Au deduction in all cons       |   g/t in conc |per MRI contract|
    |_______________________________|_______________|________________|
    |Ag in all cons                 |          %    |per MRI contract|
    |_______________________________|_______________|________________|
    |Ag deduction in all cons       |   g/t in conc |per MRI contract|
    |_______________________________|_______________|________________|
    |                                      Offsite costs             |
    |________________________________________________________________|
    |Cu conc treatment              |  US$/dmt conc |per MRI contract|
    |_______________________________|_______________|________________|
    |Cu refining charge             | US$/lb pay Cu |per MRI contract|
    |_______________________________|_______________|________________|
    |Au refining charge             | US$/oz pay Au |per MRI contract|
    |_______________________________|_______________|________________|
    |Ag refining charge             | US$/oz pay Ag |per MRI contract|
    |_______________________________|_______________|________________|
    |Transport, marketing, ins, etc.|  US$/dmt conc |          169.54|
    |_______________________________|_______________|________________|
    |Royalties                      |          %    |               1|
    |_______________________________|_______________|________________|
    |                                    Operating Costs             |
    |________________________________________________________________|
    |UG mining cost                 |  C$/ore tonne |           36.00|
    |_______________________________|_______________|________________|
    |Processing cost                |C$/milled tonne|           16.50|
    |_______________________________|_______________|________________|
    |G&A cost                       |C$/milled tonne|           11.90|
    |_______________________________|_______________|________________|
    |Total Site Costs               |C$/milled tonne|           64.40|
    |_______________________________|_______________|________________|
    |Internal Dilution              |          %    |               5|
    |_______________________________|_______________|________________|

Small underground mineralized zones were not converted to a mineral
reserve if they required excessive development.  The total Minto Mine
mineral reserve estimate is summarized below.

Minto – Mineral Reserves by Class for Phase VI

     _____________________________________________________________________
    |           | Mineral |      |   Diluted Grade  |    Contained Metal  |
    |           | Reserve |Tonnes|__________________|_____________________|
    |           |  Class  | (kt) |Cu (%)| Au  | Ag  | Cu   | Au  |Ag (koz)|
    |           |         |      |      |(g/t)|(g/t)|(Mlbs)|(koz)|        |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |                                 Open Pit Mineral Reserves           |
    |_____________________________________________________________________|
    |           |   Proven|1,596 | 2.26 |1.21 |8.12 |   79 |  62 |   417  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |    North  | Probable|   9  | 1.68 |0.58 |6.92 |   0  |   0 |     2  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|1,604 | 2.26 |1.21 |8.12 |   80 |  62 |   419  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|1,073 | 1.02 |0.25 |2.12 |   24 |   9 |    73  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |  Ridgetop | Probable|1,020 | 1.00 |0.28 |2.97 |   22 |   9 |    97  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|2,093 | 1.01 |0.26 |2.54 |   46 |  18 |   171  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|   -  |    - |  -  |  -  |   -  |   - |     -  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |      118  | Probable|  483 | 1.28 |0.10 |1.81 |   14 |   2 |    28  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|  483 | 1.28 |0.10 |1.81 |   14 |   2 |    28  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|3,306 | 1.44 |0.54 |4.99 |  105 |  57 |   530  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |   Area 2  | Probable|1,694 | 1.00 |0.27 |3.20 |   37 |  15 |   174  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|5,000 | 1.29 |0.45 |4.38 |  142 |  72 |   704  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|5,974 | 1.58 |0.67 |5.31 |  208 | 128 |  1,020 |
    |  Open Pit |_________|______|______|_____|_____|______|_____|________|
    |  Subtotal | Probable|3,204 | 1.04 |0.25 |2.92 |   74 |  25 |   301  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|9,179 | 1.39 |0.52 |4.48 |  282 | 153 |  1,321 |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |                              Underground Mineral Reserves           |
    |_____________________________________________________________________|
    |           |   Proven|   -  |   -  |   - |   - |   -  |   - |     -  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |Minto East | Probable|  709 | 2.28 |1.04 |6.15 |   36 |  24 |   140  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|  709 | 2.28 |1.04 |6.15 |   36 |  24 |   140  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|   -  |   -  |   - |   - |   -  |   - |     -  |
    |  Area 2 / |_________|______|______|_____|_____|______|_____|________|
    |     118   | Probable|1,731 | 1.76 |0.74 |7.19 |   67 |  41 |   400  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|1,731 | 1.76 |0.74 |7.19 |   67 |  41 |   400  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|  106 | 1.74 |0.61 | 6.3 |   4  |   2 |    22  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |Copper Keel| Probable|1,455 | 1.81 |0.65 | 6.7 |   58 |  30 |   313  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|1,561 | 1.81 |0.64 |6.67 |   62 |  32 |   335  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|  301 |  1.8 |0.77 |6.06 |   12 |   7 |    59  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |  Wildfire | Probable|   59 | 1.59 |1.00 |7.85 |   2  |   2 |    15  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|  360 | 1.76 | 0.8 |6.35 |   14 |   9 |    73  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|  407 | 1.78 |0.73 |6.12 |   16 |   9 |    81  |
    |Underground|_________|______|______|_____|_____|______|_____|________|
    | Subtotal  | Probable|3,954 | 1.87 |0.76 |6.83 |  163 |  97 |   868  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|4,361 | 1.86 |0.76 |6.77 |  179 | 106 |   948  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |           |   Proven|  852 | 1.23 |0.41 |3.71 |   23 |  11 |   102  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |Stockpiles | Probable|   -  |   -  |   - |   - |   -  |   - |     -  |
    |           |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|  852 | 1.23 |0.41 |3.71 |   23 |  11 |   102  |
    |___________|_________|______|______|_____|_____|______|_____|________|
    |                                                Total                |
    |_____________________________________________________________________|
    |           |   Proven|7,233 | 1.55 |0.64 |5.17 |  247 | 148 |  1,203 |
    |    Total  |_________|______|______|_____|_____|______|_____|________|
    |   Mineral | Probable|7,158 | 1.50 |0.53 |5.08 |  237 | 122 |  1,169 |
    |  Reserves |_________|______|______|_____|_____|______|_____|________|
    |           |Sub-total|14,392| 1.53 |0.58 |5.12 |  484 | 270 |  2,371 |
    |___________|_________|______|______|_____|_____|______|_____|________|

Life-of-Mine Production and Processing Schedule
The Phase VI mining sequence is divided into various stages.  The
surface mining sequence commences with ore production from Area 2 -
Stages 1 & 2 followed by mining of Area 118, then Minto North, Area 2 -
Stage 3 and finally the two stages (North and South pits) associated
with the Ridgetop Deposit.  Underground mining operations will begin
with production from the 118 zone of MSD after the ramp bypasses Area 2
and continues to the Minto East Deposit.  Minto East, Area 118 and Area
2 underground mineral reserves will be developed to provide stable
production while an additional decline is developed to the Copper Keel
zone of MSD.  In 2018, a new portal will be developed to extract ore
from the Wildfire deposit.  Once underground mining of Wildfire is
completed, Minto will cease all mining operations if no additional
mineral reserves are identified before then.

The LOM production schedule and processing schedule are summarized
below:

Phase VI LOM Production Schedule

     __________________________________________________________________________
    |Parameter|   Unit  |Total |2012 | 2013 | 2014 |2015 |2016 |2017 |2018|2019|
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |Total OP/UG                                                               |
    |__________________________________________________________________________|
    |    Total|     kt  |44,484|9,948|10,302|10,011|7,310|4,917|1,870|125 |  - |
    |    Waste|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |  ROM ore|     kt  |13,539|2,056|2,456 |2,430 |2,394|1,948|1,200|696 |360 |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    | Open Pit|Waste:Ore|  4.75| 4.8 |  4.9 |  5.8 | 4.3 | 4.0 | 3.7 |  - |  - |
    |Stripping|         |      |     |      |      |     |     |     |    |    |
    |    Ratio|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    | Cu Grade|    %Cu  |  1.59|1.29 | 1.51 | 2.07 |1.30 |1.35 |1.55 |1.83|1.76|
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    | Au Grade|    g/t  |  0.68|0.45 | 0.50 | 1.03 |0.43 |0.46 |0.61 |0.63|0.80|
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    | Ag Grade|    g/t  |  5.50|4.35 | 4.81 | 7.38 |4.31 |3.65 |5.93 |6.66|6.35|
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |    Total| Mlbs Cu |   460|  59 |   82 |  111 |  69 |  58 |  41 | 28 | 14 |
    | Mined Cu|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |    Total|  koz Au |   259|  30 |   39 |   81 |  33 |  29 |  24 | 14 |  9 |
    | Mined Au|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |    Total|  koz Ag | 2,256| 288 |  380 |  576 | 332 | 228 | 229 |149 | 73 |
    | Mined Ag|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |  ROM ore|  kt/day |     -|5.63 | 6.73 | 6.66 |6.56 |5.34 |3.29 |1.91|0.99|
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|
    |    Total|  kt/day |     -|32.89|34.95 |34.08 |26.59|18.81|8.41 |2.25|0.99|
    | Material|         |      |     |      |      |     |     |     |    |    |
    |_________|_________|______|_____|______|______|_____|_____|_____|____|____|

Phase VI LOM Process Production Schedule

     _________________________________________________________________________________________________________________
    |          |       |         |                                                     Y   E   A   R                  |
    |__________|_______|_________|____________________________________________________________________________________|
    |Parameter |  UNIT |   Total |  2012 |  2013 |  2014 |  2015 |  2016 |  2017 |  2018 |  2019 | 2020 | 2021 | 2022 |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |Mill Feed |dmt/day|   3,750 | 3,750 | 3,750 | 3,750 | 3,750 | 3,750 | 3,750 | 3,750 | 3,750 |3,750 |3,750 |3,750 |
    |   Rate   |       |         |       |       |       |       |       |       |       |       |      |      |      |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |Mill Feed |   Mt  |  14,393 | 1,373 | 1,369 | 1,369 | 1,369 | 1,369 | 1,369 | 1,369 | 1,369 |1,369 |1,369 |  654 |
    |  Total   |       |         |       |       |       |       |       |       |       |       |      |      |      |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          |  Cu % |   1.53  |  1.50 |  1.88 |  2.29 |  2.19 |  1.74 |  1.70 |  1.70 |  1.17 | 0.74 | 0.74 | 0.74 |
    |          |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |Feed Grade|Au g/t |   0.58  |  0.56 |  0.69 |  1.15 |  1.01 |  0.65 |  0.66 |  0.60 |  0.41 | 0.16 | 0.16 | 0.16 |
    |          |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          |Ag g/t |   5.10  |  5.18 |  6.42 |  8.23 |  7.89 |  5.16 |  6.30 |  5.90 |  3.68 | 1.89 | 1.89 | 1.89 |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          |   Cu  |    92%  |   92% |   92% |   92% |   92% |   92% |   92% |   92% |   92% |  92% |  92% |  88% |
    | Recovery |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    | to Conc. |   Au  |    70%  |   70% |   70% |   70% |   70% |   70% |   70% |   70% |   70% |  70% |  70% |  70% |
    |          |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          |   Ag  |    78%  |   78% |   78% |   78% |   78% |   78% |   78% |   78% |   78% |  78% |  78% |  78% |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |   Conc.  |  % Cu |     -   |  37.0 |  38.4 |  41.8 |  41.2 |  37.6 |  37.4 |  37.4 |  35.5 | 32.9 | 32.9 | 32.9 |
    |   Grade  |       |         |       |       |       |       |       |       |       |       |      |      |      |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |  Conc.   |   dmt | 532,689 |51,487 |61,600 |68,920 |66,993 |58,332 |57,343 |57,271 |41,340 |28,294|28,216|12,894|
    |Production|       |         |       |       |       |       |       |       |       |       |      |      |      |
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          |Mlb Cu |    444  |   42  |   52  |   63  |   61  |   48  |   47  |   47  |   32  |   21 |   20 |   9  |
    |   Conc.  |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |   Metal  | oz Au | 188,826 |17,311 |21,122 |35,524 |31,230 |20,112 |20,479 |18,449 |12,509 |4,888 |4,875 |2,329 |
    |          |_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|
    |          | oz Ag |1,835,613|178,220|220,340|282,351|270,763|177,640|216,405|202,366|126,422|65,127|64,949|31,029|
    |__________|_______|_________|_______|_______|_______|_______|_______|_______|_______|_______|______|______|______|

Capital and Operating Costs
The following table reviews capital expenditures without closure costs.
 The major decrease in capital costs versus the Phase V PSF was due to
the continued utilization of Contractor Open Pit mining rather than
owner operated.  Therefore, purchase of the open pit mobile equipment
fleet ($32 million) is avoided.  A closure cost allowance of $25
million continued to be reflected in the cash flow analysis, as per an
estimation completed in 2010.  A sustaining capital cost allowance of
$5.6 million is also reflected in the cash flow analysis.  Capital
expenditures for the life of mine are summarized as follows:

Capital Costs by Major Area

     __________________________________________________
    |Area                           |Unit|Cost Estimate|
    |_______________________________|____|_____________|
    |Open Pit Mining                | M$ |          2.5|
    |UG equipment (fixed and mobile)| M$ |         33.4|
    |UG development                 | M$ |         34.8|
    |Process plant                  | M$ |         10.3|
    |Site Infrastructure            | M$ |         18.7|
    |Permitting                     | M$ |          3.3|
    |_______________________________|____|_____________|
    |TOTAL CAPITAL COST             | M$ |        102.7|
    |_______________________________|____|_____________|

The table below presents a summary of the operating costs by major area.

Average Life of Mine Unit Operating Costs by Major Area

     _________________________________________________________________
    |Area                                    |    Unit  |Cost Estimate|
    |________________________________________|__________|_____________|
    |Open Pit Mining                         |$/t mined |         3.54|
    |                                        |$/t milled|        20.37|
    |________________________________________|__________|_____________|
    |Underground Mining                      |$/t milled|        35.95|
    |________________________________________|__________|_____________|
    |Total Mining (weighted average)         |$/t milled|        24.68|
    |Processing                              |$/t milled|        17.20|
    |General, administration, camp, royalties|$/t milled|        10.81|
    |________________________________________|__________|_____________|
    |Total                                   |$/tmilled |        52.69|
    |________________________________________|__________|_____________|

Economics
The following table summarizes the economic and production assumptions
associated with the Phase VI Pre-feasibility Study:

Phase VI Economic Results

     ___________________________________________________________________
    |                 Item      |         Unit    |            Value    |
    |___________________________|_________________|_____________________|
    |Waste mined                |           Mt    |           44,484    |
    |___________________________|_________________|_____________________|
    |Ore mined                  |           Mt    |           13,539    |
    |___________________________|_________________|_____________________|
    |Total mined                |           Mt    |           58,023    |
    |___________________________|_________________|_____________________|
    |Mill Feed*                 |           Kt    |           14,393    |
    |___________________________|_________________|_____________________|
    |Open Pit Stripping Ratio   |      Waste:Ore  |            4.75     |
    |___________________________|_________________|_____________________|
    |Copper millhead grade      |         % Cu    |            1.53     |
    |___________________________|_________________|_____________________|
    |Gold millhead grade        |        g/t Au   |            0.58     |
    |___________________________|_________________|_____________________|
    |Silver millhead grade      |        g/t Ag   |             5.1     |
    |___________________________|_________________|_____________________|
    |Copper in cons             |          Mlb    |             444     |
    |___________________________|_________________|_____________________|
    |Gold in cons               |           Oz    |          188,826    |
    |___________________________|_________________|_____________________|
    |Silver in cons             |           Oz    |         1,835,613   |
    |___________________________|_________________|_____________________|
    |Concentrate Grade          |         % Cu    |Variable by mill feed|
    |___________________________|_________________|_____________________|
    |Copper Price               |        US$/lb   |            3.25     |
    |___________________________|_________________|_____________________|
    |Gold price (inc. hedging)  |        US$/oz   |             300     |
    |___________________________|_________________|_____________________|
    |Silver price (inc. hedging)|        US$/oz   |            3.90     |
    |___________________________|_________________|_____________________|
    |Exchange rate              |        US$/C$   |             1:1     |
    |___________________________|_________________|_____________________|
    |Unit Total OPEX            |    C$/t milled  |            52.69    |
    |___________________________|_________________|_____________________|
    |Unit On-site OPEX          |C$/lb Cu payable |            1.76     |
    |___________________________|_________________|_____________________|
    |Unit Off-site OPEX         |US$/lb Cu payable|            0.29     |
    |___________________________|_________________|_____________________|
    |Unit By-product Credit     |US$/lb Cu payable|           (0.14)    |
    |___________________________|_________________|_____________________|
    |Unit OPEX net by-product   |US$/lb Cu payable|            1.92     |
    |credits                    |                 |                     |
    |___________________________|_________________|_____________________|
    |Total Capital              |           $M    |             103     |
    |___________________________|_________________|_____________________|
    |Allowance for closure cost |           $M    |              25     |
    |___________________________|_________________|_____________________|

*Mill Feed includes Ore Stockpile

The following table summarizes the economic key performance indicators
associated with the revised pit designs and underground mining that
includes the new Cu Keel and Wildfire mineral reserves:

     _________________________________________________________________
    |Before-Tax Cash|After-Tax Cash|Before-Tax|After-Tax|After-Tax IRR|
    |     Flow      |     Flow     | NPV8.0%  | NPV8.0% |             |
    |_______________|______________|__________|_________|_____________|
    |         429   |        290   |     278  |    192  |      184%   |
    |_______________|______________|__________|_________|_____________|

The incremental cash flow that demonstrates the economic benefit
associated with underground mining of Cu Keel and Wildfire is:

     _________________________________________________________________
    |   Item  |Before-Tax|After-Tax|Before-Tax|After-Tax|After-Tax IRR|
    |         |Cash Flow |Cash Flow| NPV8.0%  | NPV8.0% |             |
    |_________|__________|_________|__________|_________|_____________|
    |Cu Keel /|      71  |     35  |      32  |     15  |       31%   |
    |Wildfire |          |         |          |         |             |
    |_________|__________|_________|__________|_________|_____________|

Permitting
In Yukon, mining projects require an environmental assessment prior to
the issuance of significant operating permits for mining, including a
Type A Water Use Licence and a Quartz Mining Licence.  The Phase IV
expansion (2010) has been assessed under the Yukon Environmental and
Socioeconomic Assessment Board (YESAB) beginning in August 2010 and the
Phase V project YESAB assessment application is partially completed and
will be filed in the third quarter of 2012 after updating to include
the additional mineral reserves included in the Phase VI PFS.  The
licensing process is partly complete with the QML issued and the Type A
Water Use Licensing application associated with permitting in-pit
disposal of the Area 2 tailing has been declared adequate and the
public hearing is scheduled for the first week of July 2012.  It is
anticipated that the amended water use license will follow shortly
thereafter.

Following completion of the YESAB evaluation process, subsequent
applications to further amend the Quartz Mining License and the Water
Use License will support the implementation of the Phase VI mine plan.

Risk and Opportunities
The major risk areas identified in this study are:

      1. Timing and approval of Phase V and Phase VI WUL permits;
      2. Exchange rates, metal prices and other external influences;
      3. The ability to develop the UG mine as per the Phase VI mining
         schedule and forecasted costs;
      4. Acquisition of experienced personnel for underground and open pit
         mining; and
      5. The ability to maintain minimum dilution through effective grade
         control practices.

The most important opportunities to improve the project are:

      1. Optimization of the mine plan;
      2. Reduce operating costs through continuous improvement initiatives;
      3. Continued strong demand for copper resulting in sustained high
         copper prices;
      4. Discovering new mineral resources and converting them into mineral
         reserves; and
      5. As underground mine development advances and costs are sunk there
         may be opportunities to extract mineral resources not currently
         considered mineral reserves.

Looking Forward
The Phase VI Pre-feasibility study has demonstrated economic
justification for Capstone to submit and pursue licence and permit
applications to continue with the development of the additional mineral
reserves and to continue exploring new targets in the vicinity of the
known deposits.

Technical Report
The full Phase VI PFS, prepared as a NI 43-101 compliant Technical
Report, will be filed under Capstone’s profile on SEDAR at www.sedar.com within 45 days.

Quality Assurance and NI 43-101 Compliance
The technical information in this news release has been prepared in
accordance with Canadian regulatory requirements set out in National
Instrument 43-101 Standards of Disclosure for Mineral Projects of the
Canadian Securities Administrators (“NI 43-101″) and reviewed by John
Sagman, P. Eng., a “Qualified Person” and Vice President, Technical
Services, Capstone Mining Corp.  The PFS was prepared with input from
the following: Wayne Barnett, Pr.Sci.Nat., SRK Consulting (Canada),
Inc., John Eggert, P.Eng, Eggert Engineering Ltd; Bruce Murphy, FSAIMM,
SRK Consulting (Canada), Inc.; Bill Hodgson, P.Eng., Genivar Inc.;
Garth Kirkham, P. Geo, Kirkham Geosystems Ltd; Michael Levy, PE, SRK
Consulting (Canada), Inc.; Brad Mercer, P.Geol. Capstone Mining Corp.;
Pooya Mohseni, P.Eng. Minto Exploration; Marek Nowak, P.Eng., SRK
Consulting (Canada) Inc.; and Colleen Roche, P.Eng. Capstone Mining
Corp. who are responsible for certain sections of the PFS as detailed
in the PFS and this release.

In addition, Gregg Bush, Senior Vice President and Chief Operating
Officer for Capstone Mining Corp. reviewed and approved this news
release.

Cautionary Note Regarding Forward-Looking Information
This document may contain “forward-looking information” within the
meaning of Canadian securities legislation and “forward-looking
statements” within the meaning of the United States Private Securities
Litigation Reform Act of 1995 (collectively, “forward-looking
statements”). These forward-looking statements are made as of the date
of this document and Capstone Mining Corp. (the “Company”) does not
intend, and does not assume any obligation, to update these
forward-looking statements, except as required under applicable
securities legislation.

Forward-looking statements relate to future events or future performance
and reflect Company management’s expectations or beliefs regarding
future events and include, but are not limited to, statements with
respect to the estimation of mineral reserves and mineral resources,
the realization of mineral reserve estimates, the timing and amount of
estimated future production, costs of production, capital expenditures,
success of mining operations, environmental risks, unanticipated
reclamation expenses, title disputes or claims and limitations on
insurance coverage. In certain cases, forward-looking statements can be
identified by the use of words such as “plans”, “expects” or “does not
expect”, “is expected”, “outlook”, “budget”, “scheduled”, “estimates”,
“forecasts”, “intends”, “anticipates” or “does not anticipate”, or
“believes”, or variations of such words and phrases or statements that
certain actions, events or results “may”, “could”, “would”, “might” or
“will be taken”, “occur” or “be achieved” or the negative of these
terms or comparable terminology. In this document certain
forward-looking statements are identified by words including
“scheduled”, “guidance”, “plan”, “planned”, “estimated”, “projections”,
“projected” and “expected”. By their very nature forward-looking
statements involve known and unknown risks, uncertainties and other
factors which may cause the actual results, performance or achievements
of the Company to be materially different from any future results,
performance or achievements expressed or implied by the forward-looking
statements. Such factors include, among others, risks related to actual
results of current exploration activities; changes in project
parameters as plans continue to be refined; future prices of mineral
resources; possible variations in ore reserves, grade or recovery
rates; accidents, dependence on key personnel, labour pool constraints,
labour disputes; delays in obtaining governmental approvals or
financing or in the completion of development or construction
activities; and other risks of the mining industry as well as those
factors detailed from time to time in the Company’s interim and annual
financial statements and management’s discussion and analysis of those
statements, all of which are filed and available for review on SEDAR at
www.sedar.com. Although the Company has attempted to identify important
factors that could cause actual actions, events or results to differ
materially from those described in forward-looking statements, there
may be other factors that cause actions, events or results not to be as
anticipated, estimated or intended. There can be no assurance that
forward-looking statements will prove to be accurate, as actual results
and future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue reliance
on forward looking statements.

Alternative Performance Measures
The items marked with a “((1))” are Alternative performance measures and readers should refer to
Alternative Performance Measures in the Company’s Interim Management’s
Discussion and Analysis for the three months ended March 31, 2012 as
filed on SEDAR and as available on the Company’s website for further
details.

SOURCE Capstone Mining Corp.