Quantcast
Last updated on April 16, 2014 at 7:51 EDT

First Nations and Alaskan Tribes show support for Alberta-Alaska rail link

November 14, 2012

New railway would provide market access, avoid B.C. oil tanker and
pipeline conflicts

VANCOUVER, Nov. 14, 2012 /PRNewswire/ – Leaders of the affected First Nations
and Alaskan Tribes have expressed support for a new “purpose built”
railway that would link Alaska, Yukon, northern British Columbia and
northern Alberta to the rest of North America.

The railway, being proposed by G Seven Generations Ltd. (G7G), would
provide access to Pacific tidewater for the import and export of
commodities including oil sands products.

“The greatest strength of our Alberta-Alaska railway concept is the
support it has received from First Nations along the route,” points out
G7G Partner and CEO Matt Vickers.

“Studies have already demonstrated that a rail link to Alaska is a
viable alternative to the oil pipelines currently being planned through
British Columbia,” said Vickers. “This approach is timely because it
promises significant economic benefits to First Nations communities and
all of Canada while avoiding many of the environmental risks associated
with current pipeline proposals and related supertanker traffic off
B.C.’s West Coast.”

“British Columbians opposition to oil tanker traffic on B.C.’s coast is
very strong and should not fall on deaf ears,” states Chief Marilyn
Slett of the Heiltsuk Nation.

“Diversifying markets for Canadian oil is an important challenge, but we
need to achieve this goal in the most environmentally and socially
responsible way possible,” adds Grand Chief Roland Twinn of Treaty 8
Alberta.

A key advantage of G7G’s rail link is that it would utilize the existing
marine terminal in Valdez, which is facing a declining supply of oil
from Alaska’s North Slope. The estimated 2,400-kilometre-long railway
would run northwest from Fort McMurray, Alberta to connect with the
Alyeska Pipeline at Delta Junction, approximately 130 kilometres
southeast of Fairbanks. The Trans-Alaska Pipeline System (TAPS)
currently carries oil from the North Slope to the Valdez marine super
tanker terminal.

“Valdez has seen oil tanker traffic since the 1970s; this proposal would
simply mean replacing the declining supply of Alaska crude with a new
supply of Alberta crude. We believe this approach has a greater chance
of obtaining social license from local communities than other competing
scenarios,” said Chief Ronald Kreutzer of Fort McMurray First Nation.

“We began with outreach to First Nations and Tribal Leadership and are
now moving forward with informing the membership through community
meetings,” said Vickers, who holds traditional names from the Heiltsuk
and Tsimshian Nations. “G7G is pleased that we have been able to offer
First Nations from Alberta to Alaska a    50-percent stake in the
railroad.”

“The First Nations fully support the concept because in reality, if we
don’t take the initiative somebody else will,” said Chief Simon Mervyn,
of the First Nation Na-cho Nyak Dun.

G7G will now complete the project’s feasibility study and community
information meetings. The next phase is the approval process, which
will include full community consultation and accommodation, and lead to
the development of the business plan.

Current First Nations support for the rail-link concept is specific to
exploring the feasibility of the project.

SOURCE G Seven Generations Ltd.

Image with caption: “Dedicated to Alternative Solutions for the benefit of all. (CNW Group/G Seven Generations Ltd.)”. Image available at: http://photos.newswire.ca/images/download/20121114_C8259_PHOTO_EN_20689.jpg


Source: PR Newswire