Quantcast
  • E-mail
  • Print
  • Comment
  • Font Size
  • Digg
  • del.icio.us
  • Discuss article

Pelangio Advised of Drill Results From Detour Gold's Drilling Program at Detour Lake, Ontario (DG-07-157 Intersects 2.28 G/T Over 75.5 M in Calcite Zone)

Posted on: Wednesday, 16 January 2008, 09:00 CST

Pelangio Mines Inc. (TSX: PLG) ("Pelangio" or the "Company") has been advised by Detour Gold Corporation ("Detour Gold") that it has released drill results from the first 34 holes of the Phase II drilling program at its Detour Lake property in northern Ontario. Detour Gold started Phase II drilling in July 2007 and thus far has completed 181 holes totaling 63,432 metres (including 15 holes abandoned totaling 1,290 metres).

Pelangio has a 49.4% equity interest in Detour Gold (20 million shares). Detour Gold issued a press release today, the verbatim text of which follows:

"Detour Gold Reports First Results of 2007 Phase II Drilling at its Detour Lake Property in Northern Ontario, Canada (DG-07-157 intersects 2.28 g/t over 75.5 m in Calcite Zone)

Detour Gold Corporation (TSX: DGC) ("Detour Gold" or the "Company") is pleased to report the drill results of the first 34 holes from its Phase II drilling program at its Detour Lake property in northern Ontario. The Company started Phase II drilling in July 2007 and thus far has completed 181 holes totaling 63,432 metres (including 15 holes abandoned for 1,290 metres). There are six (6) active drill rigs on site; four of which are on the Phase II program and two on the exploration program.

The 2007-08 Phase II program will total approximately 110,000 metres and is expected to be completed in the second quarter of 2008. As announced last week, approximately 50,000 metres was added to this program to expand the deposit west of the Calcite Zone and to follow up on additional mineralization that was found in the hanging wall during the 2007 campaign. The Company is planning on releasing a mineral resource update by mid-2008, which would include Phase I and approximately half of Phase II drilling.

Successful results were obtained in the Calcite Zone where four (4) of six (6) holes returned gold grades ranging from 1 to 2 g/t over wide intervals of 50 metres or more. The Calcite Zone is relatively untested with only 14 holes drilled in Phase I and remains open to the west for another 1.5 kilometres. In the Gap Zone, eight (8) of the nine (9) drill holes (including one abandoned) tested only a small portion of the mineralized corridor, near the upper level of the Chert Marker Horizon (CMH) and footwall zone. In the West Pit area, assays from 19 holes (including two abandoned holes) continue to return excellent and consistent results.

The best mineralized (uncut) intervals encountered are shown below.

 West Pit: ------------------------------------------------------------------------ DG-07-128                 DG-07-129         DG-07-135         DG-07-140 ---------                 ---------         ---------         ---------- 14.22 g/t                  4.85 g/t          1.38 g/t         43.82 g/t   over 7.0 m             over 17.7 m       over 52.0 m        over 9.0 m                                                                 5.34 g/t                                                              over 10.0 m DG-07-144                 DG-07-146        DG-07-147A ---------                 ---------        ---------- 1.56 g/t                   1.99 g/t          2.52 g/t   over 75.0 m            over 59.0 m       over 35.0 m Calcite Zone: ------------------------------------------------------------------------ DG-07-138                 DG-07-142         DG-07-145         DG-07-157 ---------                 ---------         ---------         --------- 1.38 g/t                   1.34 g/t          1.14 g/t          2.28 g/t   over 50.0 m            over 48.0 m       over 56.0 m       over 75.5 m 

On December 11, 2007, Detour Gold reported a resource update that included Phase I drilling. The open pit resource (capped at 20 g/t gold) contains 4.8 million ounces of gold in the measured and indicated categories (89.9 million tonnes grading 1.67 g/t) and 3.0 million ounces of gold in the inferred category (63.3 million tonnes grading 1.49 g/t), using a gold price of US$575 per ounce (equivalent to a cut-off grade of 0.64 g/t gold). The current resource is contained within one large pit, located in the area of the former Detour Lake mine, which produced 1.8 million ounces of gold from 1983 to 1999.

Complete tables of results, surface and longitudinal plans and cross-sections for the Detour Lake deposit are posted on the Company's website www.detourgold.com /Projects/Detour Lake or http://www.hdgold.com/dgc/LatestDrillResults.asp or on the home page "Explore Detour Lake".

Detour Gold's exploration program is being managed by Project Manager, Mr. Roger Aubertin, P.Eng., a Qualified Person within the meaning of National Instrument 43-101. Mr. Aubertin has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The December 2007 mineral resource was prepared by Thon Consulting and audited by Michael W. Kociumbas, P.Geo., Vice-President of Watts, Griffis and McOuat Limited. The NI 43-101 Technical Report is expected to be filed by the end of January.

Samples are prepared and assayed at SGS Minerals Services in Don Mills, Ontario, Canada. Analysis for gold is done on sawn half core samples using fire assay (AA finish). Samples with higher grade gold ( greater than 5 g/t) are re-assayed using the pulp and metallics procedures. Standard reference materials, blank and field duplicate samples are inserted prior to shipment from site to monitor the quality control of the assay data. For additional information on Quality Assurance and Quality Control, refer to the press release dated April 11, 2007.

Details on the current mineral resource are available in the Press Release dated December 11, 2007, which is posted on the Company's website or on SEDAR (www.sedar.com).

 For further information, please contact: Gerald Panneton,                  Laurie Gaborit,  President and CEO                 Director Investor Relations Tel: (416) 304-0800               Tel: (416) 304-0581 Detour Gold Corporation, Royal Bank Plaza, North Tower, 200 Bay Street, Suite 2040, Toronto, Ontario M5J 2J1 

Information Concerning Estimates of Mineral Resources

This news release uses the terms 'measured', 'indicated' and 'inferred' resources. Detour Gold advises investors that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of Disclosure for Mineral Projects), the U.S. Securities and Exchange Commission does not recognize them. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, 'inferred resources' have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, or economic studies except for Preliminary Assessment as defined under 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

                        Detour Lake Project - Highlights of Drill Results ---------------------------------------------------------------------------                                                                 Au                                                                Au  Cut to     Host                Section       From       To  Length   Uncut  20 g/t     Rock Hole No.            No.        (m)      (m)     (m)   (g/t)   (g/t)    Unit --------------------------------------------------------------------------- --------------------------------------------------------------------------- DG-07-128      19,460E       47.0     58.0    11.0    0.88    0.88 (West Pit)             ----------------------------------------------------                             113.0    123.0    10.0    1.91    1.91                        ----------------------------------------------------                             138.0    149.0    11.0    1.31    1.31                        ----------------------------------------------------                             182.0    189.0     7.0    1.98    1.98                        ----------------------------------------------------                                                                       Lower                                                                      Pillow                             205.0    212.0     7.0   14.22    3.75     Flow                        ----------------------------------------------------                        Inc. 206.0    206.5     0.5  166.63   20.00                        ----------------------------------------------------                             319.0    326.0     7.0    1.92    1.92                        ----------------------------------------------------                             372.0    382.0    10.0    0.70    0.70                        ----------------------------------------------------                                                                       PF/MF DG-07-129      19,600E      283.0    304.0    21.0    1.32    1.32  contact (West Pit)             ----------------------------------------------------                                                                       Lower                                                                      Pillow                             326.0    343.7    17.7    4.85    3.05     Flow                        ----------------------------------------------------                        Inc. 341.0    341.5     0.5   83.57   20.00 --------------------------------------------------------------------------- DG-07-130      19,400E       96.0    121.0    25.0    0.77    0.77 (West Pit)             ----------------------------------------------------                                                                      Pillow                             203.0    235.0    32.0    1.10    1.10     Flow                        ----------------------------------------------------                                                                      Pillow                             243.9    255.0    11.1    2.93    2.73     Flow                        ----------------------------------------------------                        Inc. 250.7    251.3     0.6   23.70   20.00                        ----------------------------------------------------                             341.0    348.0     7.0    1.51    1.51 --------------------------------------------------------------------------- DG-07-131      19,400E      Abandoned, not sampled (West Pit) --------------------------------------------------------------------------- DG-07-131A     19,400E      No significant results, drilled in footwall (West Pit) --------------------------------------------------------------------------- DG-07-132      19,400E       68.0     75.7     7.7    1.89    1.89 (West Pit)             ----------------------------------------------------                             154.0    159.0     5.0    2.38    2.38 --------------------------------------------------------------------------- DG-07-133      18,880E      153.0    159.0     6.0    1.17    1.17 (Gap Zone)             ----------------------------------------------------                                                                       Upper                                                                       Mafic                             204.5    222.0    17.5    1.41    1.41     Flow                        ----------------------------------------------------                             247.0    252.0     5.0    2.33    2.33                        ----------------------------------------------------                             312.0    317.0     5.0    1.56    1.56                        ----------------------------------------------------                             359.0    367.0     8.0    3.00    3.00 --------------------------------------------------------------------------- DG-07-134      18,960E      No significant results  (Gap Zone) --------------------------------------------------------------------------- DG-07-135                                                             PF/MF (West Pit)     19,480E       30.0     82.0    52.0    1.38    1.02  contact                        ----------------------------------------------------                        Inc.  81.5     82.0     0.5   57.70   20.00                        ----------------------------------------------------                                                                       Mafic                             138.0    145.0     7.0    5.28    3.11     Flow                        ----------------------------------------------------                        Inc. 143.0    144.0     1.0   35.20   20.00                        ----------------------------------------------------                                                                    Footwall                                                                        Talc                             258.0    282.0    24.0    1.79    1.79   Schist --------------------------------------------------------------------------- DG-07-136      20,320E       43.0     50.0     7.0    1.15    1.15 (West Pit)             ----------------------------------------------------                             283.0    290.0     7.0    1.11    1.11 --------------------------------------------------------------------------- DG-07-137      18,960E       37.0     48.0    11.0    0.79    0.79 (Gap Zone)             ----------------------------------------------------                                                                       Mafic                              60.0     76.4    16.4    2.76    1.63     Flow                        ----------------------------------------------------                        Inc.  72.0     72.5    0.50   57.16   20.00                        ----------------------------------------------------                             126.0    140.0    14.0    1.38    1.38 --------------------------------------------------------------------------- DG-07-138      18,460E       66.0     73.0     7.0    1.16    1.16 (Calcite Zone)         ----------------------------------------------------                                                                      Pillow                             190.0    240.0    50.0    1.38    1.38     Flow                        ----------------------------------------------------                             284.0    291.0     7.0    1.13    1.13                        ----------------------------------------------------                             368.0    378.6    10.6    1.08    1.08 --------------------------------------------------------------------------- DG-07-139      20,180E       61.0     73.0    12.0    0.77    0.77 (West Pit)             ----------------------------------------------------                             340.0    347.0     7.0    1.38    1.38 --------------------------------------------------------------------------- DG-07-140      19,520E       40.0     47.0     7.0    2.02    2.02 (West Pit)             ----------------------------------------------------                              95.0    117.4    22.4    1.04    1.04                        ----------------------------------------------------                                                                       MF/PF                             133.0    142.0     9.0   43.82    1.44  contact                        ----------------------------------------------------                        Inc. 135.9    136.4     0.5  782.84   20.00                        ----------------------------------------------------                                                                       Mafic                             190.0    200.0    10.0    5.34    2.59     Flow                        ----------------------------------------------------                        Inc. 196.0    196.5     0.5   22.46   20.00                        ----------------------------------------------------                        Inc. 198.3    199.0     0.7   57.43   20.00                        ----------------------------------------------------                             224.0    232.0     8.0    1.19    1.19                        ----------------------------------------------------                             303.0    315.0    12.0    1.27    1.27 --------------------------------------------------------------------------- DG-07-141      18,920E       65.0     72.0     7.0    1.43    1.43 (Gap Zone)             ---------------------------------------------------- --------------------------------------------------------------------------- DG-07-142      18,460E       63.0     70.0     7.0    1.08    1.08 (Calcite Zone)         ----------------------------------------------------                                                                      Pillow                              86.0    134.0    48.0    1.34    1.34     Flow                        ----------------------------------------------------                             188.0    199.0    11.0    0.78    0.78 --------------------------------------------------------------------------- DG-07-143      18,840E      Abandoned, not sampled (Gap Zone) --------------------------------------------------------------------------- DG-07-143A     18,840E       70.0     78.0     8.0    1.10    1.10 (Gap Zone)             ---------------------------------------------------- --------------------------------------------------------------------------- DG-07-144      19,520E       20.0     27.0     7.0    2.10    2.10 (West Pit)             ----------------------------------------------------                                                                      Pillow                             106.0    181.0    75.0    1.56    1.27     Flow                        ----------------------------------------------------                        Inc. 106.6    107.1     0.5   63.53   20.00 ---------------------------------------------------------------------------                                                                      Pillow DG-07-145      18,460E       29.0     85.0    56.0    1.14    1.14     Flow (Calcite Zone)        ----------------------------------------------------                                                                       Lower                                                                      Pillow                              98.0    120.0    22.0    1.16    1.16     Flow                        ----------------------------------------------------                             163.0    172.0     9.0    0.86    0.86                        ----------------------------------------------------                                                                       Upper                                                                       Mafic                             186.0    192.0     6.0    4.35    4.35     Flow                        ----------------------------------------------------                                                                       Mafic                             204.0    225.0    21.0    2.08    1.59     Flow                        ----------------------------------------------------                        Inc. 211.0    212.0     1.0   30.18   20.00 --------------------------------------------------------------------------- DG-07-146      20,080E      245.0    304.0    59.0    1.99    1.66   MF/CMH (West Pit)             ----------------------------------------------------                        Inc. 254.0    255.0     1.0   30.94   20.00                        ----------------------------------------------------                        Inc. 273.6    274.3     0.7   32.23   20.00 --------------------------------------------------------------------------- DG-07-147      19,480E      Abandoned, not sampled (West Pit) --------------------------------------------------------------------------- DG-07-147A     19,480E       35.0     42.0     7.0    1.24    1.24                        ----------------------------------------------------                             101.0    108.0     7.0    1.05    1.05                        ----------------------------------------------------                                                                      Pillow                             170.0    199.0    29.0    0.78    0.78     Flow                        ----------------------------------------------------                             213.0    221.0     8.0    1.53    1.53                        ----------------------------------------------------                             240.8    248.0     7.2    1.48    1.48                        ----------------------------------------------------                                                                       Lower                                                                      Pillow                             264.0    299.0    35.0    2.52    1.95     Flow                        ----------------------------------------------------                        Inc. 274.0    275.0     1.0   39.84   20.00                        ----------------------------------------------------                             364.8    376.0    11.2    0.99    0.99 --------------------------------------------------------------------------- DG-07-149      18,420E       56.0     67.0    11.0    0.88    0.88 (Calcite Zone)         ----------------------------------------------------                             123.0    131.0     8.0    2.68    2.52                        ----------------------------------------------------                        Inc. 125.5    126.0     0.5   22.59   20.00                        ----------------------------------------------------                             182.0    189.0     7.0    1.52    1.52 --------------------------------------------------------------------------- DG-07-150      20,040E      No significant results- drilled in footwall (West Pit) --------------------------------------------------------------------------- DG-07-152      20,020E      443.0    453.0    10.0    2.20    2.20 (West Pit)             ---------------------------------------------------- --------------------------------------------------------------------------- DG-07-153      19,520E      248.0    255.0     7.0    1.15    1.15 (West Pit)             ----------------------------------------------------                                                                       PF/MF                             277.0    298.0    21.0    1.32    1.32  contact --------------------------------------------------------------------------- DG-07-154      18,820E       96.0    103.0     7.0    2.32    2.32 (Gap Zone)             ----------------------------------------------------                             124.0    131.0     7.0    1.93    1.93 --------------------------------------------------------------------------- DG-07-155      18,460E       66.0     71.0     5.0    2.01    2.01 (Calcite Zone)         ---------------------------------------------------- --------------------------------------------------------------------------- DG-07-157                                                            Pillow (Calcite Zone) 18,540E      147.5    223.0    75.5    2.28    1.59     Flow                        ----------------------------------------------------                        Inc. 147.5    148.0     0.5  102.31   20.00                        ----------------------------------------------------                        Inc. 222.0    223.0     1.0   31.10   20.00                        ----------------------------------------------------                                                                       Lower                                                                      Pillow                             241.0    281.0    40.0    1.29    1.05     Flow                        ----------------------------------------------------                        Inc. 252.0    252.5     0.5   39.05   20.00                        ----------------------------------------------------                                                                       PF/MF                             297.0    304.0     7.0    4.50    4.48  contact                        ----------------------------------------------------                        Inc. 299.0    300.0     1.0   20.20   20.00 --------------------------------------------------------------------------- DG-07-158      19,440E       43.0     50.0     7.0    1.41    1.41 (West Pit)            ----------------------------------------------------                                                                      Pillow                              72.0     86.0    14.0    3.08    2.83     Flow                        ----------------------------------------------------                        Inc.  72.0     73.0     1.0   21.99   20.00 ---------------------------------------------------------------------------                        Inc.  85.5     86.0     0.5   22.99   20.00                        ----------------------------------------------------                                                                       Lower                                                                      Pillow                             106.0    124.0    18.0    1.96    1.90     Flow                        ----------------------------------------------------                        Inc. 115.5    116.0    0.50   22.09   20.00                        ----------------------------------------------------                             330.0    337.0     7.0    1.50    1.50 --------------------------------------------------------------------------- DG-07-159      18,800E       53.0     62.0     9.0    1.53    1.53 (Gap Zone)             ---------------------------------------------------- --------------------------------------------------------------------------- DG-07-160      19,720E      298.5    308.5    10.0    2.03    1.74 (West Pit)             ----------------------------------------------------                        Inc. 298.5    299.0     0.5   25.89   20.00 --------------------------------------------------------------------------- DG-07-162      18,760E       55.0     62.0     7.0    0.94    0.94 (Gap Zone)             ---------------------------------------------------- --------------------------------------------------------------------------- Note: All values above 20 g/t in the composite are reported in the table.       True width is estimated to be 65 to 75% of the drilled length. 

Forward-Looking Information

Certain statements herein may contain forward-looking information within the meaning of applicable securities laws. Forward-looking information appears in a number of places and can be identified by the use of words such as "intends" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information includes statements regarding the Company's exploration plans with respect to the Property and the estimation of mineral resources and are subject to such forward-looking risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such risks include gold price volatility, change in equity markets, the uncertainties involved in interpreting geological data, increase in costs and exchange rate fluctuations and other risks involved in the gold exploration and development industry as well as those risk factors discussed under "Risk Factors" in the Company's final prospectus dated January 22, 2007 available at www.sedar.com. There can be no assurance that forward-looking information referenced herein will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements or information. Also, many of the factors are beyond the control of Detour Gold. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information herein is qualified by this cautionary statement. The Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

About Pelangio

Pelangio is a gold exploration company active in the top-ranked mining jurisdictions in the world, Canada and Ghana. The Company's main focus is to advance its exploration programs on its premier land position in Ghana totaling 290 square kilometres, located on strike and adjacent to AngloGold Ashanti's Obuasi gold mine.

Pelangio also has a 49.4% equity interest in Detour Gold, which controls the Detour Lake advanced exploration project. The near-term objective of Detour Gold is to advance the Detour Lake project to development and production.

Reliance on Detour Gold and Forward-Looking Statements

The information contained in this press release is a verbatim extract of the press release issued by Detour Gold. Although Pelangio believes the information included in the press release to be generally reliable, the data has not been independently verified and Pelangio does not assume any liability for the accuracy or completeness of such information. Furthermore, as noted above in the verbatim extract, the press release may contain forward-looking information within the meaning of applicable securities laws. Such information includes the statements contained in the verbatim extract regarding Detour Gold's exploration and drilling plans, plans to update the mineral resource and the estimation of mineral resources and are subject to risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. The risks include those that are set out above in the verbatim extract and those contained in Detour Gold's prospectus as noted above. See also, the risks set out in Pelangio's annual information form, management information circular and quarterly and annual management's discussion and analysis. There is no assurance that the forward-looking information contained in the press release will prove to be accurate. Accordingly, readers should not place undue reliance on the forward-looking information.

All of the information contained in the press release is qualified by this cautionary statement.

 Contacts: Pelangio Mines Inc. Ingrid Hibbard President & CEO (905) 875-3828 or Toll Free: 1-877-746-1632 (905) 875-3829 (FAX)  Pelangio Mines Inc. Warren Bates Vice President Exploration (905) 875-3828 or Toll Free: 1-877-746-1632 (905) 875-3829 (FAX) Email: info@pelangio.com Website: www.pelangio.com

SOURCE: Pelangio Mines Inc.


Source: MARKET WIRE

More News in this Category


Related Articles



Rating: 3.5 / 5 (4 votes)
Rate this article:
1/52/53/54/55/5

User Comments (0)

Comment on this article

Your Name
Text from the image
Comment
max 1200 chars
* All fields are required