Sierra Gold Corporation Announces Shipping of Gold Processing Plants and River Dredge to Sierra Leone
Posted on: Monday, 11 August 2008, 09:01 CDT
TORONTO, Aug. 11, 2008 (PRIME NEWSWIRE) -- Sierra Gold Corporation (Pink Sheets:SGCP) announced today that the two 10 ton, state-of- the-art, gold processing plants are scheduled to be shipped from Texas in less than 2 weeks and are due to arrive in Sierra Leone on October 1st. The new portable plants will be available to process gold for the fall mining season. These plants are ideally suited for placer/alluvial, hard rock and sand/gravel operations. They are very cost effective and boast a 95-98% recovery rate. The company will now have the capability to process up to 20 tons per hour, which will considerably speed up gold production. Additionally, this technology offers an environmentally friendly process with no chemicals and reduced water use.
Sierra Gold also announced today that the recently purchased Air-Lift river dredge will be transported to its Sewa river property next week. Logistical and set-up operations will be soon underway. The company will start test operations on site toward the end of this month. The dredge will now allow the company to extract gold from the gravels at the bottom of the river and to continue to produce gold throughout the rainy season.
Doug Evans, CEO of Sierra Gold, commented: "We are excited about the addition of the new equipment with its ability to take the company a giant step forward from our present local methods of processing gold. As a result, we anticipate a significant increase in additional gold reserves and increased value to the shareholders."
Sierra Gold is engaged in the exploration and development of gold and diamond properties in West Africa. The Birimian greenstone belt of West Africa has had a long history of gold mining and prospecting. The region has been one of the fastest gold producing areas worldwide. Sierra Leone's neighbours, Ghana and Mali, are the second and third largest gold producers in all of Africa.
Safe Harbor: No assurance can be given that past or similar results of precious metal mining will be indicative of future results. This news release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 (The "Act"). In particular, when used in the preceding of discussion, the words "pleased,""plan,""confident that,""believe,""expect," or "intent to" and similar conditional expressions are intended to identity forward-looking statements within the meaning of the Act and are subject to the safe harbor created by the Act. Such statements are subject to certain risks and uncertainties and actual results could differ materially from those expressed in any of the forward-looking statements. Such risks and uncertainties include, but are not limited to, market conditions, general acceptance of the company's products and technologies, competitive factors, the ability to successfully complete additional financings and other risks in the company's SEC reports and filings.
This news release was distributed by PrimeNewswire, www.primenewswire.com
CONTACT: Sierra Gold Corporation John Rolston 619-398-9262 www.sierragoldcorp.com
Source: PrimeNewswire
Related Articles
- Sierra Gold Corporation Positioned to Increase Gold Production Tenfold With Arrival of New Processing Plants
- Mechel OAO Announces the Commissioning of Its New Mining and Processing Plant at the Voskhod Chrome Ore Deposit
- CNPC Commences Operations at Second Sulige Gas Processing Plant
- Enterprise's Pioneer Processing Plant Begins Commercial Operations
- Golden Star Declares Commercial Production at Bogoso Sulfide Processing Plant in Ghana
- Rio Tinto Coal Australia Hunter Valley Operations Together With Matrikon Inc. Win "Minerals Process Plant of the Year" Award
- Pearl Asian Mining Industries To Purchase Small Scale Processing Plant Up To 16+ Tons/Day Production In The Placer Gold Recovery of ''Operation Cagayan De Oro''
- Franklin Releases Potential Production Capacity of First Cerro Rico Processing Plant
- Gold Processing Plant to Be Built in Torbat Heydariyeh
User Comments (0)

RSS Feeds