Exploration drilling permit received for Raven Underground Coal project
Posted on: Tuesday, 26 May 2009, 10:23 CDT
TSX-V TRADING SYMBOL: CEC
Compliance Coal Corporation dba Comox Joint Venture ("CJV") has just received an exploration permit from BC's Ministry of Energy, Mines and Petroleum Resources to drill up to 53 holes (15,000 meters) on the Raven Underground Coal Project. The Raven project has 39,093,000 tonnes of measured and indicated and 59,004,000 tonnes of inferred coal resources as reported in the Company's 43-101 Technical Report prepared by O.R. Cullingham Resource Consultant Ltd. The primary objective of this year's exploration program is to increase the 39.0 million tonnes of measured and indicated resources by upgrading the 59.0 million tonnes of inferred resources. In addition, extensive coal quality sampling and testing will be conducted including washability, carbonization, and petrographic tests. The Raven Coal deposit is inherently a High Volatile A Bituminous metallurgical coal and the testing will help determine the ultimate wash plant process and forecasted plant yield and the coal's suitability for sale on the international metallurgical, thermal and PCI coal markets. In addition, this summer's program will include hydrogeological sampling including the installation of six piezometers and two pump tests. Gas desorption canisters and geotechnical samples will also be taken to assist in mine design.
The CJV is currently reviewing responses to its Requests for Proposals to complete a feasibility study on the project and will announce a successful bidder in the near future. The successful bidder will immediately begin preliminary work on the feasibility study and is targeting delivery of a final feasibility study in the second quarter of 2010 after incorporation of the results from this year's drilling program. The Raven project has an existing elaborate network of logging roads so only a minimal amount of new road and drill pad construction will be necessary before drilling can commence. Drilling is expected to commence by
In addition to this summer's exploration program, the CJV has also hired AMEC Earth and Environmental to prepare an environmental assessment on the project. AMEC has initiated its environmental baseline monitoring including hydrology, surface water quality, wildlife, and fisheries. The CJV expects to file a project description with BC's Environmental Assessment Office in
All of the activities leading up to a production decision will be funded from the
Compliance Energy Corporation's shares trade on the TSX Venture Exchange under the symbol CEC and investor information is available on the Company's web page at www.complianceenergy.com.
On behalf of the Board of COMPLIANCE ENERGY CORPORATION John Tapics Chief Executive Officer The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.Note: This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results. Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statements.
SOURCE Compliance Energy Corporation
Source: PR Newswire
Related Articles
- Further Coal intersections at Comox JV's Raven Coal Project
- Drilling at the Raven underground coal project continues to upgrade the resource
- Environmental Power Corporation Announces First Quarter 2009 Business Update Conference Call
- Environmental Tectonics Corporation Announces That the NYSE AMEX LLC has Extended the Timeframe for the Company to Regain Compliance With Listing Standards
- Environmental Tectonics Corporation Announces Project Financing Arrangement with H.F. Lenfest, Director and Significant Shareholder
- Environmental Power Corporation's Microgy, Inc. Subsidiary Signs Letter of Intent With Swift & Company to Develop Waste-to-Energy Facility at Grand Island, Nebraska Beef Plant
- Environmental Power Corporation Files Registration Statement for Equity Offering
- Environmental Power Corporation Renewable Energy Projects Positively Impacted By Energy Law; Enactment of the Federal Energy Law Provides Incentives for Alternative Energy
- Environmental Power Corporation Appoints John F. O'Neill As CFO; Seasoned Energy Executive to Begin July 1
User Comments (0)

RSS Feeds