Quantcast
  • E-mail
  • Print
  • Comment
  • Font Size
  • Digg
  • del.icio.us
  • Discuss article

California Transportation Commission Allocates Nearly $1 Billion in New Transportation Funding; Total Transportation Dollars Reach a Record $4.2 Billion for 2005-06 Fiscal Year

Posted on: Thursday, 8 June 2006, 18:00 CDT

The California Transportation Commission (CTC) today set aside close to a billion dollars ($970 million) in new transportation funding for 362 projects throughout the state.

Major projects receiving funding allocations include:

-- Los Angeles - $29.9 million was allocated for a project that

will add new carpool lanes on State Route 60 between State

Route 605 and Azusa Avenue.

-- Sacramento - $44.2 million was allocated for two public

transit projects. 95 Compressed Natural Gas buses and 40

paratransit vans will be purchased, and Light Rail will be

extended from downtown Sacramento to the Amtrak station.

-- San Bernardino - $25 million was allocated to construct new

carpool lanes on six miles of Interstate 215 in downtown San

Bernardino.

-- Bay Area - $39.3 million was allocated to add auxiliary lanes,

reconstruct an overcrossing and install ramp meters on Highway

101 from San Mateo to Millbrae.

-- San Joaquin County - $6.2 million was allocated to add a new

northbound lane to Interstate 5 between Interstate 205 and

State Route 120, south of Stockton.

-- San Diego - $9.2 million was allocated to construct 12 miles

of double tracking between Escondido and Oceanside to improve

the Pacific Surfliner intercity rail service.

Please see below for a list of project allocations by the CTC. CTC Financial Vote List June 7-8, 2006 ---------------------------------------------------------------------- 2.5 Highway Financial Matters ------------------------------------------------------------- Allocation Location Amount Project Description Recipient Project Support Expenditures County Dist-Co-Rte Postmile ------------------------------------------------------------- $1,183,000 In Los Angeles, on Routes 210 and 170 at various locations. Highway planting Los Angeles restoration. 07S-LA-210 Various ------------------------------------------------------------- $2,754,000 In Arnold, from Moran Road to Meko Drive at Camp Connell Maintenance Station. Pavement Calaveras rehabilitation. 10N-Cal-4 42.7/49.6 ------------------------------------------------------------- $5,088,000 Near Richardson Grove, from Mendocino/Humboldt County line to the Humboldt Southfork Eel River Bridge. Mill and 01N-Hum-101 replace asphalt concrete. 0.01/R17.9 ------------------------------------------------------------- $610,000 Near Cobb, from east of Wild Cat Road to west of Diener Road. Shoulder widening. Lake 01N-Lak-175 11.8/12.1 ------------------------------------------------------------- $2,620,000 Near Willis, west of Broaddus Creek Bridge. Realign curve and widen shoulder. Mendocino 01N-Men-20 26.3/27.1 ------------------------------------------------------------- $2,107,000 Near Cummings, from 0.7 miles south of Hermitage Vista Point to Mendocino /Humboldt Mendocino County line. Mill and replace asphalt 01N-Men-101 concrete. R85.4/T106.8 ------------------------------------------------------------- $1,500,000 Near Doyle, from Doyle to Garnier/South Herlong Roads. Mill and replace asphalt Lassen concrete. 02N-Las-36 24.5/29.0 ------------------------------------------------------------- $3,800,000 Near Johnstonville, from Johnstonville to Litchfield. Mill and replace asphalt Lassen concrete. 02N-Las-395 64.0/71.3 ------------------------------------------------------------- $1,500,000 Near Lakehead, from Lakehead to Flume Creek. Mill and replace asphalt concrete. Shasta 02N-Sha-5 44.0/58.0 ------------------------------------------------------------- $28,500,000 Near Shasta Lake City, at Pit River Bridge from south of Bridge Bay to south of Shasta Turntable Bay. Replace bridge deck. 02N-Sha-5 R27.4/R29.0 ------------------------------------------------------------- $750,000 Near Redding, from west of Deschutes Road to 9 miles east of Deschutes Road. Mill and Shasta replace asphalt concrete. 02N-Sha-299 31.0/41.0 ------------------------------------------------------------- $1,500,000 Near Mount Shasta, from Lake Street to north of Deetz Road. Mill and replace asphalt Siskiyou concrete. 02N-Sis-5 10.0/16.0 ------------------------------------------------------------- $1,250,000 Near Dorris, from 2 miles north of Grass Lake Safety Roadside Area to 1.3 miles south of Siskiyou Route 161. Mill and replace asphalt 02N-Sis-97 concrete. 24.0/52.5 ------------------------------------------------------------- $1,000,000 In Butte, Sacramento, and Yuba Counties, at various locations. Place open graded Butte asphalt concrete on five ramps and polyester 03N-But-Var concrete overlay at one bridge deck. Various ------------------------------------------------------------- $400,000 In Arbuckle, from 0.2 miles south of Hillgate undercrossing to to North Arbuckle Colusa undercrossing. Mill and replace asphalt 03N-Col-5 concrete. R6.6/R7.7 ------------------------------------------------------------- $182,000 Near Williams, from 0.2 miles of Funk Slough Overflow to 0.2 miles of north of North Colusa Maxwell overcrossing. Mill and replace 03N-Col-5 asphalt concrete. R28.8/R29.5 ------------------------------------------------------------- $455,000 Near Coloma, south of Route 153. Reconstruct embankment, remove existing culverts, place El Dorado dike, and apply erosion control. 03U-ED-49 21.5 ------------------------------------------------------------- $654,000 Near Placerville, from 0.2 miles east of Newtown Road to 2.1 miles west of the El Dorado Southfork American River Bridge (BR #25- 03N-ED-50 008). AC overlay. 20.9/37.5 ------------------------------------------------------------- $1,647,000 Near Truckee, from 0.1 west of Castle Peak undercrossing to 0.2 miles east of Donner Nevada Lake undercrossing. Replace slabs, mill and 03N-Nev-80 replace asphalt concrete. R4.9/R9.2 ------------------------------------------------------------- $3,343,000 Near Emigrant Gap, from Carpenter Flat undercrossing to Hampshire Rock Placer undercrossing. Replace slab. 03N-Pla-80 R56.1/R66.3 ------------------------------------------------------------- $2,340,000 Near Colfax, from Secret Town overcrossing to Alta Road undercrossing. Mill and replace Placer asphalt concrete. 03N-Pla-80 38.3/44.8 ------------------------------------------------------------- $1,560,000 In and near Tahoe City, from El Dorado/Placer County line to West River Street. Mill and Placer replace asphalt concrete. 03N-Pla-89 0.0/21.5 ------------------------------------------------------------- $181,000 Near Lincoln at Sierra College Boulevard. Traffic signal installation. Placer 03N-Pla-193 3.0 ------------------------------------------------------------- $375,000 Near Sacramento at Hedge Avenue. Traffic signal installation. Sacramento 03N-Sac-16 4.6 ------------------------------------------------------------- $3,000,000 In Sacramento, 0.4 miles west of Excelsior Road to 0.3 miles east of Excelsior Road. Sacramento Intersection widening and signal 03N-Sac-16 installation. 8.3 ------------------------------------------------------------- $315,000 Near Camptonville, north of Ridge Road. Embankment repair. Yuba 03U-Yub-49 2.8 ------------------------------------------------------------- $400,000 Near Livermore, from Grant Line Road to El Charro Road Replace slab. Alameda 04N-Ala-580 2.7/15.9 ------------------------------------------------------------- $400,000 Near Fremont, from Mission Boulevard to Route 84 Junction. Replace slab. Alameda 04N-Ala-680 2.2/11.8 ------------------------------------------------------------- $160,000 In Oakland, from 23rd Avenue to 5th Avenue. Replace slab. Alameda 04N-Ala-880 28.9/30.3 ------------------------------------------------------------- $250,000 In Oakland, from High Street/42nd Avenue to Oakland Oak/Madison Streets. Mill and Alameda replace asphalt concrete. 04N-Ala-880 27.9/31.1 ------------------------------------------------------------- $330,000 Near Pittsburg, from east Port Chicago Highway to Bailey Road. Replace slabs. Contra Costa 04N-CC-4 18.0/20.3 ------------------------------------------------------------- $700,000 Near Hercules, from Willow Avenue to Somersville Road. Mill and replace asphalt Contra Costa concrete. 04N-CC-4 2.2/26.0 ------------------------------------------------------------- $540,000 Near Dublin, from Alcosta Boulevard to Rudgear Road. Mill and replace asphalt Contra Costa concrete. 04N-CC-680 0.0/12.6 ------------------------------------------------------------- $3,450,000 In and near Napa, from Route 221 Junction to First Street. Mill and replace asphalt Napa concrete. 04N-Nap-29 7.4/11.3 ------------------------------------------------------------- $13,500,000 In East Palo Alto, Menlo Park, and Redwood City, from the Santa Clara County line to San Mateo north of Whipple Avenue. Pavement 04N-SM-101 rehabilitation. 0.0/6.7 ------------------------------------------------------------- $500,000 In Los Gatos, between Route 9 and Lark Avenue. Replace concrete pavement slabs. Santa Clara 04N-SCl-17 7.0/8.0 ------------------------------------------------------------- $750,000 Near Suisun City, from Scandia Road to Drouin Drive. Mill and replace asphalt concrete. Solano 04N-Sol-12 7.1/25.7 ------------------------------------------------------------- $19,300,000 In Vacaville, from Route 80 to the Yolo County Line. Pavement rehabilitation. Solano 04N-Sol-121 R0.0/R10.6 ------------------------------------------------------------- $1,375,000 Near Cotati, from Route 116 Junction to Dry Creek Road. Mill and replace asphalt Sonoma concrete. 04N-Son-101 12.6/36.3 ------------------------------------------------------------- $7,172,000 In and near Salinas, Sanborn Road to north of San Miguel Canyon Road. Mill and replace Monterey asphalt concrete pavement. 05N-Mon-101 86.0/98.9 ------------------------------------------------------------- $3,103,000 Near Cambria, from west of Santa Rosa Creek Road to west of Jack Creek Road. Repair San Luis Obispo earthquake damaged pavement. 05U-SLO-46 R7.8/R15.1 ------------------------------------------------------------- $2,379,000 In and near San Luis Obispo, Buena Vista to Santa Barbara Road. Replace slabs, grind San Luis Obispo and overlay with asphalt concrete 05S-SLO-101 29.9/42.0 ------------------------------------------------------------- $778,000 Near Carpinteria, from the Ventura County line to south of Carpinteria Creek Bridge. Santa Barbara Highway planting mitigation. 05S-SB-101 R0.0/R2.1 ------------------------------------------------------------- $298,000 Near Cuyama at the Cuyama River Bridge. Replace rock slope protection. Santa Barbara 05U-SB-166 69.9 ------------------------------------------------------------- $3,020,000 In and near Watsonville, Route 129 to Freedom Blvd. Mill and replace asphalt concrete Santa Cruz pavement 05N-SCr-1 R1.0/8.4 ------------------------------------------------------------- $3,295,000 In and near Santa Cruz, Rio Del Mar Blvd to Emeline Street. Mill and replace asphalt Santa Cruz concrete pavement 05N-SCr-1 9.2/16.6 ------------------------------------------------------------- $1,052,000 Near Ben Lomond, south of Western Avenue. Construct retaining wall. Santa Cruz 05U-SCr-9 10.9 ------------------------------------------------------------- $765,000 Near Bakersfield at Renfro Road intersection. Install signal and left turn Kern channelization. 06S-Ker-58 44.8/45.3 ------------------------------------------------------------- $482,000 Near Bakersfield at the intersection of Route 43 and Enos Lane. Signal installation. Kern 06S-Ker-119 18.1 ------------------------------------------------------------- $525,000 Near Fresno, Route 5 to Quail Avenue. Mill and replace asphalt concrete pavement Kings 06S-Kin-41 15.5/20.0 ------------------------------------------------------------- $740,000 Near Hanford, 1.5 miles west of Route 41 to 19th Avenue. Mill and replace asphalt Kings concrete pavement 06S-Kin-198 7.2/9.4 ------------------------------------------------------------- $1,770,000 In and near Tulare, from Kern County line to Avenue 264. Mill, replace slabs and asphalt Tulare concrete overlay 06S-Tul-99 0.00/33.2L ------------------------------------------------------------- $200,000 In Torrance at Rolling Hill Way. Signal and roadway improvement. Los Angeles 07S-LA-1 14.8 ------------------------------------------------------------- $810,000 At westbound off-ramp to Peck Road. Signal installation. Los Angeles 07S-LA-60 11.1 ------------------------------------------------------------- $250,000 In Los Angeles County, east of Rocky Peak Road. Install grated line drain. Los Angeles 07S-LA-118 0.307/0.388 ------------------------------------------------------------- $290,000 On State Route 138, from the State Route 14/138 interchange to 40th Street East. Los Angeles Install LED extinguishable message sings and 07S-LA-138 upgrade signal controllers. 43.4/47.8 ------------------------------------------------------------- $550,000 In Los Angeles County, on Venice Boulevard at Midway Avenue and Glendon Avenue. Install Los Angeles traffic signal. 07S-LA-187 6.5 ------------------------------------------------------------- $200,000 In Ventura County at the intersection of Bridgegate Street. Install traffic signals Ventura and safety lighting. 07S-Ven-23 2.0 ------------------------------------------------------------- $559,000 Near Piru, east of Rocky Peak Road. Asphalt concrete overlay. Ventura 07S-Ven-126 29.81/32.73 ------------------------------------------------------------- $7,630,000 Near Highland, from north of Highland Avenue to south of City Creek Bridge. Construct San Bernardino rock slope protection wall and rebuild 08U-SBd-330 embankment slopes. 30.8/31.8 ------------------------------------------------------------- $2,850,000 In and near Merced, from 5 miles north of the Madera County line to East Atwater Blvd. Merced Mill and replace asphalt concrete pavement 10N-Mer-99 5.0/21.0 ------------------------------------------------------------- $1,750,000 In Los Banos, from West I street to east of Santa Fe Road. Mill and replace asphalt Merced concrete pavement 10N-Mer-152 19.5/25.0 ------------------------------------------------------------- $500,000 In Stockton, from south of Eighth Street to Charter Way. Grind and replace slabs. San Joaquin 10N-SJ-5 23.9/25.1 ------------------------------------------------------------- $595,000 Near Winterhaven, from the Mexico Border to north of Route 186/8 separation and on Route Imperial 8 at 4th Avenue. Apply microsurfacing. 11S-Imp-186 0.0/2.1 ------------------------------------------------------------- $1,710,000 Near Dulzura, east of Marron Valley Road to west of Route 188 and north of Thing Road to San Diego Route 94. Thin blanket overlay. 11S-SD-94 30.0/38.9 ------------------------------------------------------------- $520,000 In San Diego at Kearny Villa Road. Traffic signal installation. San Diego 11S-SD-805 31.9 ------------------------------------------------------------- $442,000 In Huntington Beach and Westminster, on Beach Boulevard at Edinger. Modify signals and Orange extend northbound channelization. 12S-Ora-39 5.6 ------------------------------------------------------------- $733,000 In Irvine, on southbound Route 133 approaching southbound Route 405. Install Orange overhead signs. 12S-Ora-133 8.3/8.5 ------------------------------------------------------------- $881,000 In Seal Beach at the southbound on-ramp of Seal Beach Boulevard. Shoulder widening and Orange modify drainage. 12S-Ora-405 22.5 ------------------------------------------------------------- $789,000 In Sacramento and West Sacramento at the Tower Bridge. Widen sidewalks for joint Yolo bike and pedestrian usage. 03N-Yol-275 13.1 ------------------------------------------------------------- $19,500,000 East of Clear Lake Oaks from east of North Fork Cache Creek Bridge to west of Walker Lake Ridge Road. Roadway rehabilitation and 01N-Lak-20 realign curves. 38.5/42.0 ------------------------------------------------------------- $8,534,000 In Weed, from Route 5 to Route 265. Roadway rehabilitation. Siskiyou 02N-Sis-97 Various ------------------------------------------------------------- $7,600,000 Near Hatfiled at Lost River Bridge #2-59

. Replace bridge. Siskiyou 02N-Sis-161 18.7/19.3 ------------------------------------------------------------- $5,305,000 In Alameda County on various State Highways, Routes 13, 24, 580, 880 and at various Alameda locations. Remove gore signs and replace 04N-Ala-Var with overhead signs. Various ------------------------------------------------------------- $8,516,000 Between Oakland and Brentwood from Main Street to Sellers Avenue. Roadway Contra Costa rehabilitation. 04N-CC-4 31.1/40.8 ------------------------------------------------------------- $9,593,000 In Salinas at Route 101 and from south of Monterey Street to north of Market Circle. Monterey Roadway rehabilitation. 05N-Mon-183 0.0/0.1 ------------------------------------------------------------- $10,837,000 In Colton, San Bernardino, Loma Linda, and Redlands from west of Route 215 to east of San Bernardino Ford Street. Install traffic monitoring 08S-SBd-10 system. 23.6/33.4 ------------------------------------------------------------- $8,850,000 In Oceanside, Vista, San Marcos, and Escondido from west of College Boulevard to San Diego east of Emerald Drive and west of San Marcos 11S-SD-78 Boulevard to west of Route 15/78 separation. 3.2/5.0 Pavement rehabilitation. ------------------------------------------------------------- $750,000 In Siskiyou County at various locations. Replace culverts, headwalls, rock slope Siskiyou protection and reconstruction. 02N-Sis-96 Various ------------------------------------------------------------ $5,900,000 In and near Sacramento, from Mack Road to Florin Road. Construct auxiliary lanes. Sacramento 03N-Sac-99 17.7/19.6 ------------------------------------------------------------ $2,033,000 Near Priest Valley, west of the Fresno County line. Repair failed embankment. Monterey 05U-Mon-198 21.1/21.5 ------------------------------------------------------------ $3,404,000 Near Colusa, on State Route 20 near Steer Department of Ditch Bridge to near Sycamore Road. Widen Transportation and add passing lanes Colusa LTC Colusa 03N-Col-20 36.0/38.0 ------------------------------------------------------------- $39,343,000 In San Mateo, from 3rd Avenue to Millbrae Department of Avenue in Millbrae. Add auxiliary lanes, Transportation reconstruct overcrossings, ramp meters. MTC San Mateo 04N-SM-101 13.5/17.9 ------------------------------------------------------------- $3,247,000 North of Marin-Sonoma Narrows, on auxiliary Department of lane through Petaluma on southbound US 101 Transportation from Route 116 to East Washington. Early MTC Operational Improvements. Sonoma 04N-Son-101 3.8/4.8 ------------------------------------------------------------- $4,200,000 In Madera County, south of Gateway Drive off- Department of ramp to north of South Madera overcrossing. Transportation Modify interchanges. Madera LTC Madera 06N-Mad-99 9.1/9.8 (14.6/15.8) ------------------------------------------------------------- $29,905,000 In the city of Industry, from Route 605 to Department of Azusa Avenue. Construct one HOV Lane in Transportation each direction. LACMTA Los Angeles 07S-LA-60 11.7/18.0 ------------------------------------------------------------- $31,194,000 In Burbank, between Hollywood Way and Alameda Department of Avenue. Modify interchange and construct Transportation new ramps. LACMTA Los Angeles 07S-LA-134 1.4/2.3 ------------------------------------------------------------- $11,450,000 Route 152 / 156 Interchange. Construct Santa Clara Westbound Route 152 to Southbound Route 156 Valley Flyover and Other Interchange Improvements. Transportation Authority MTC Santa Clara 04N-SCl-152 23.0/21.0 ------------------------------------------------------------- $2,500,000 In Kern County near Shafter. On 7th Standard Kern County Road from SR 99 to Coffee Road. Grade KCOG separation and Interchange upgrade. Kern 06S-Ker-99 R30.5/R31.1 ------------------------------------------------------------- $370,000 7th Street Bike Lanes. In the city of Eureka, City of Eureka on 7th Street between J Street and Myrtle HCAOG Avenue. Pavement widening for bike lanes. 01-Humboldt ------------------------------------------------------------- $25,000 Walnut Drive Rehabilitation. On Walnut Drive Humboldt County between Cypress Street and Fern Street. HCAOG Rehabilitate and overlay roadway. 01-Humboldt ------------------------------------------------------------- $25,000 Fieldbrook Bicycle and Pedestrian Shoulder Humboldt County Improvements. In Humboldt County, on HCAOG Fieldbrook Road for a distance of 01-Humboldt approximately 1.5 miles. Construct 4 to 6 foot shoulders. ------------------------------------------------------------- $18,000 Local Streets Road Rehabilitation. In the City of Point city of Point Arena, at various locations. Arena Rehabilitate streets including sidewalk MCOG construction, pavement overlays and drainage 01-Mendocino improvements. ------------------------------------------------------------- $172,000 2000 STIP Railroad Crossing Rehabilitation. City of Ukiah In the city of Ukiah, on Gobbi Street, MCOG Perkins Street, Talmage Road, and Clara 01-Mendocino Avenue. Rehabilitate railroad crossings. ------------------------------------------------------------- $128,000 Railroad Crossing Rehabilitation. In Ukiah, City of Ukiah on Ford Street, Commerce Drive, Airport MCOG Road, and Plant Road railroad crossings. 01-Mendocino Remove and replace AC pavement. ------------------------------------------------------------- $131,000 Gobbi Street/Orchard Avenue Improvements. In City of Ukiah the city of Ukiah, at intersection of Gobbi MCOG Street and Orchard Avenue. Construct traffic 01-Mendocino signal, sidewalk, curb, gutter, and Americans with Disabilities Act (ADA) ramps. ------------------------------------------------------------- $18,000 ADA Curb Ramps (Phase 5). In the city of City of Ukiah Ukiah, on North State Street and MCOG intersections of Empire Drive and Ford Road. 01-Mendocino ADA ramps at heavily traveled signalized intersections. ------------------------------------------------------------- $393,000 Holly Street and Mill Creek Drive City of Willits Rehabilitation. On Holly Street, Hazel MCOG Street, Magnolia Avenue, and Walnut Street. 01-Mendocino Asphalt concrete overlays, storm drainage, and sidewalk improvements. ------------------------------------------------------------- $74,000 Skyline Road Extension Bikeway Project. In Lassen County Susanville, on Skyline Road. Road extension Lassen LTC south and bikeway. 02-Lassen ------------------------------------------------------------- $10,000 Greenville Pavement Rehabilitation. In the Plumas County community of Greenville at 11 locations Plumas CTC (Ayoob, Pine, Jessie, Church, Mill, Hamblin, 02-Plumas Franklin, Bush, Main, Grand, and Greenville- Wolf Creek). Roadway rehabilitation. ------------------------------------------------------------- $50,000 Airport Road at Sacramento River Bridge Shasta County Replacement. In Shasta County. Replace Shasta RTPA bridges. (Bridge #06C-0008) 02-Shasta ------------------------------------------------------------- $80,000 Dunsmuir Avenue and Various Streets City of Dunsmuir Rehabilitation (Phase 1). On Dunsmuir Siskiyou LTC Avenue and associated roads. Replace 02-Siskiyou damaged asphalt. ------------------------------------------------------------- $250,000 Siskiyou Way and Alamo Avenue Rehabilitation. City of Weed Siskiyou Way and Alamo Avenue. Rehabilitate Siskiyou LTC curb, gutter, sidewalks, resurface, and 02-Siskiyou improve drainage. ------------------------------------------------------------- $5,000 North Old Stage Road Project. On North Old Siskiyou County Stage Road from Abra Lake to College Avenue, Siskiyou LTC all of Lassen Lane, and all of Abram Lake. 02-Siskiyou Overlay. ------------------------------------------------------------- $2,199,000 Auburn New Local Roads. In and near Auburn, Placer County adjacent to Route 49 between I-80 and Dry PCTPA Creek Road. New local roads. 03-Placer ------------------------------------------------------------- $4,000,000 Greenback Lane Widening. From Auburn City of Citrus Boulevard to Dewey Drive on Greenback Lane. Heights Widen roadway. SACOG 03-Sacramento ------------------------------------------------------------- $173,000 Pearl Street Bridge (No. 13C-0003). Near Sierra County Downieville, at the Downie River. Replace Sierra LTC bridge. 03-Sierra ------------------------------------------------------------- $473,000 Quintana Road/Morro Bay Boulevard Roundabout. City of Morro In the city of Morro Bay, at Quintana Road Bay and on Morro Bay Boulevard and Route 1 north SLOCOG bound off ramp. Construct a single 05-San Luis roundabout intersection to replace the six- Obispo legged intersections. ------------------------------------------------------------- $2,500,000 7th Standard Road. In the city of Kern County Bakersfield, on 7th Standard Road from State KCOG Route 99 to Wings Way. Widen road from two 06-Kern to four lanes. ------------------------------------------------------------- $16,000 Lundy Lake Road Rehabilitation. Near Lundy, Mono County on Lundy Lake Road from Route 395 to west Mono LTC end at general store. Roadway 09-Mono rehabilitation. ------------------------------------------------------------- $28,000 Owens Gorge Road Rehabilitation Near Toms Mono County Place. On Owens Gorge Road. Rehabilitation Mono LTC and overlay. 09-Mono ------------------------------------------------------------- $36,000 Owens River Road Rehabilitation. Near Mono County Crestview, on Owens River Road. Mono LTC Rehabilitate roadway. 09-Mono ------------------------------------------------------------- $64,000 Bridgeport Street Rehabilitation. Near Mono County Bridgeport on various streets. Overlay, Mono LTC construct sidewalks, curb, and gutters. 09-Mono ------------------------------------------------------------- $4,173,000 North Stockton Rehabilitation. In the city City of Stockton of Stockton, on various streets. SJCOG Rehabilitate roadway. 10-San Joaquin ------------------------------------------------------------- $30,000 Lake County Fairgrounds Sidewalks. In the City of Lakeport city of Lakeport, at the Lake County LAPC Fairgrounds. Construct walkways, landscape, 01-Lake and lighting. ------------------------------------------------------------- $232,000 Rehabilitation of East Building of Willits City of Willits Train Station. In the city of Willits, at MCOG the Historic Train Depot. Rehabilitate for 01-Mendocino use as an intermodal facility. ------------------------------------------------------------- $66,000 Ukiah and Talmage Bike and Pedestrian Mendocino County Facilities. Near the city of Ukiah, on MCOG South Dora, South State Street, East Side 01-Mendocino Road, and Fircrest Drive. Construct concrete and asphalt sidewalks. ------------------------------------------------------------- $177,000 Skyline Road Extension. In Lassen County, Lassen County from State Route 36 to Johnsonville Road Lassen LTC near the city of Susanville. Construct 02-Lassen Class I bicycle path. ------------------------------------------------------------- $30,000 Portola Pedestrian Improvements. In the city City of Portola of Portola, on Riverwalk parkway to Gulling Plumas CTC Street. Construct pedestrian link between 02-Plumas recreational facilities. ------------------------------------------------------------- $430,000 Old Oregon Trail Bike Lane. In Shasta Shasta County County, on Old Oregon Trail from Old 44 Shasta RTPA Drive to College Drive, westerly along Old 02-Shasta Alturas Road to Shasta View, and along College View Drive to Davis Ridge Road. Construct bike lane. ------------------------------------------------------------- $102,000 Sacramento-Placerville Transportation El Dorado County Corridor (SPTC) Bike Path. In El Dorado El Dorado LTC County along the old Southern Pacific 03-El Dorado Railroad right of way from Forni Road to Missouri Flat Road. Construct 2.7 miles of Class I Bike Path, improve trestle crossing, and construct parking and bicycle storage. ------------------------------------------------------------- $1,110,000 Auburn Boulevard Enhancements (Phase 1). In City of Citrus the city of Citrus Heights on Auburn Heights Boulevard from Sylvan Road to Antelope Road. SACOG Street improvements. 03-Sacramento ------------------------------------------------------------- $2,500,000 Folsom Boulevard Enhancements. In Sacramento City of Rancho County, along Folsom Boulevard between Corvdova Coloma Road and Olsen Drive-Cordova Lane. SACOG Street Enhancements. 03-Sacramento ------------------------------------------------------------- $2,300,000 Florin Road Enhancements. In Sacramento Sacramento County, on Stockton Boulevard to Elk Grove- County Florin Road along Florin Road. Construct SACOG sidewalks, bikeways, medians, lighting, 03-Sacramento landscaping, and streetscaping. ------------------------------------------------------------- $450,000 Bicycle Pavilions. At Walnut Creek, Pleasant Bay Area Rapid Hill, and Richmond BART stations. Provide Transit bicycle parking. District MTC 04-Contra Costa ------------------------------------------------------------- $8,000 East Sir Francis Drake Bicycle/Pedestrian City of Larkspur Multi-Use Wooden Bridge Rehabilitation MTC project. Replace bridge deck and railing at 04-Marin State Route 101 northbound off-ramp in the city of Larkspur. ------------------------------------------------------------- $20,000 Pine Terrace Multi-use path. In Tiburon, on Town of Tiburon Pine Terrace Road. Construct multi-use MTC path. 04-Marin ------------------------------------------------------------- $146,000 Olema-Bolinas Road Class I Bikeway. In Marin Marin County County, on Olema-Bolinas Road. Construct MTC Class I Bikeway. 04-Marin ------------------------------------------------------------- $42,300 Marin County Countrywide Bicycle Signing and Marin County Striping. In Marin County, along the MTC primary north-south and east-west bicycle 04-Marin routes. Bicycle Signing and Striping. ------------------------------------------------------------- $41,836 Marin City Streetscape and Transit Hub Marin County Improvements. In Marin City. Streetscape MTC and Transit Hub Improvements. 04-Marin ------------------------------------------------------------- $2,000,000 San Tomas Aquino Creek Bike Trail (Reach 3). City of Santa In the city of Santa Clara, Reach 3 along Clara San Tomas Aquino/Saratoga Creek between MTC Scott Boulevard and Monroe Street. 04-Santa Clara Construct grade separated multi-use path. ------------------------------------------------------------- $304,000 Moss Landing Coastal Trail. In Moss Landing, Moss Landing adjacent to Route 1 just north of the Harbor District Elkhorn Slough Bridge. Construct bicycle TAMC trail. 05-Monterey ------------------------------------------------------------- $3,000 Mission Street Bikeway at U.S. Highway 101. City of Santa In the city of Santa Barbara, on Mission Barbara Street between Modoc Road and U.S. 101 SBCAG northbound ramps. Widen Mission Street for 05-Santa Barbara Class II bikeway and sidewalk. ------------------------------------------------------------- $45,000 Carrillo Pedestrian Walkway. In the city of City of Santa Santa Barbara, on Carrillo Street between Barbara Cliff Drive and San Andres Street. SBCAG Construct pedestrian walkway. 05-Santa Barbara ------------------------------------------------------------- $250,000 Cambria Main Street Enhancements. In the San Luis Obispo community of Cambria, on Main Street between County Cambria Drive and Burton Drive. Construct SLOCOG improvements including sidewalks, bulbouts, 05-San Luis medians, and road rehabilitation. Obispo ------------------------------------------------------------- $1,000 Ashlan Avenue Median Island Landscaping. In City of Clovis the city of Clovis, on Ashlan Avenue between COFCG Whittier Avenue and McKelvy Avenue. 06-Fresno Construct a median island with landscaping and irrigation. ------------------------------------------------------------- $258,000 Shaw Avenue Median Island Landscaping. In City of Fresno and near Fresno, on Shaw Avenue between COFCG Route 99 and Golden State Boulevard. 06-Fresno Construct median island with landscaping and irrigation. ------------------------------------------------------------- $640,000 7th Standard Road Project. In the city of Kern County Bakersfield on 7th Standard Road, from KCAG State Route 99 to Wings Way. Install stamped 06-Kern concrete and landscape. ------------------------------------------------------------- $75,000 Historic 99 Pedestrian Improvements. In the City of Tulare city of Tulare, on J Street from Tulare TCAG Avenue to Cross Avenue. Install sidewalk 06-Tulare and landscaping. ------------------------------------------------------------- $400,000 Downtown Steetscape Project (Phases I and City of Tulare III). In the city of Tulare on K Street TCAG between San Joaquin Avenue and Cross Avenue. 06-Tulare Install decorative sidewalk, ornamental lighting, bollards, crosswalks, and landscaping). ------------------------------------------------------------- $190,000 Angels Walk. In the city of Los Angeles on City of Los Wilshire Boulevard. Install information Angeles markers and print guidebooks. LACMTA 07-Los Angeles ------------------------------------------------------------- $229,000 Historical Flint Wash Trail Crossing City of Pasadena Restoration. In the city of Pasadena. LACMTA Rehabilitation of historic buildings and 07-Los Angeles facilities. ------------------------------------------------------------- $191,000 Sherman Way Median Installation. In the city City of Los of Los Angeles, on Sherman Way from De Soto Angeles Avenue to Topanga Canyon Boulevard. Install LACMTA landscaped median. 07-Los Angeles ------------------------------------------------------------- $1,836,000 Pedestrian Extensions to Downtown Transit City of Santa Mall. In the city of Santa Monica, on 2nd Monica Street and 4th Street, from Wilshire LACMTA Boulevard to Colorado Avenue. Construct 07-Los Angeles streetscape and pedestrian improvements. ------------------------------------------------------------- $33,000 Commuter Bikeway Signage Phase II. Throughout Los Angeles LA County on nine bikeways. Install signs. County LACMTA 07-Los Angeles ------------------------------------------------------------- $147,000 Catch Basin Screens. In the city of Santa Los Angeles Monica, on Wilshire Boulevard, Pico County Boulevard, Main Street, Montana Street, LACMTA Broadway, and Colorado Avenue. Install 07-Los Angeles catch basins for storm water pollution prevention. ------------------------------------------------------------- $652,000 Piru-Ranco Camulos Bike Path - Center Street Ventura County Segment. In Ventura County. Construct VCTC class I bike path and adjacent pedestrian 07-Ventura path. ------------------------------------------------------------- $751,000 Riverwalk Trail (Phase I). In Mojave Narrows City of Regional Park. Construct pedestrian and Victorville bicycle paths. SANBAG 08-San Bernardino ------------------------------------------------------------- $101,000 Lake Gregory Pedestrian and Bike Path. In County of San San Bernardino County, around Lake Gregory Bernardino in the San Bernardino Mountains. Construct SANBAG pedestrian and bicycle paths. 08-San Bernardino ------------------------------------------------------------- $161,000 California City Boulevard Sidewalk California City improvements. In California City, from KCOG Conklin Road to Randsburg Mojave Road. 09-Kern Construct sidewalk, driveway approaches, and ADA ramps. ------------------------------------------------------------- $32,000 Golden State Boulevard Landscaping. In the City of Turlock city of Turlock, on Golden State Boulevard STNCOG from Christofferson Parkway to Monte Vista 10-Stanislaus Avenue. Landscape median island. ------------------------------------------------------------- $4,000 Countryside Median Landscaping. In the city City of Turlock of Turlock on Countryside Drive, from STNCOG Tuolumne Road to Fulkerth Road. Landscape 10-Stanislaus median island. ------------------------------------------------------------- $50,000 North State Street Improvements (Phase 1). Mendocino County Near the city of Ukiah on North State Street MCOG (CR 104). Construct a continuous left turn 01-Mendocino lane, improve intersection by either installing or upgrading signal, and provide bicycle lanes and drainage. ------------------------------------------------------------- $200,000 Lathrop Road Grade Separation with UPRR. In City of Lathrop the westerly portion of the City of Lathrop SJCOG on Lathrop Road between Interstate 5 and 06-San Joaquin Route 99 between 7th Street and McKinley Avenue. Construct 4-lane overpass. ------------------------------------------------------------- $200,000 In El Dorado County, on US 50 just east of El Dorado County the El Dorado Hills/Latrobe Road El Dorado LTC Interchange. Construct bicycle/pedestrian El Dorado overcrossing. 03N-ED-50 0.8/1.0 ------------------------------------------------------------- $275,000 In El Dorado County, along the west side of El Dorado County State Route 49 from the Northside School to El Dorado LTC the intersection of State Routes 49 and 193, El Dorado and on State Route 193 from the State Route 03N-ED-50 49 intersection to the community of Auburn 33.5/34.5 Lake Trails. Construct Class I bike path and a Class II bike lane. ------------------------------------------------------------- $350,000 In the city of Los Angeles, on Route 101 City of Los between Main Street and Los Angeles Street. Angeles Sidewalk widening, traffic lane LACMTA reconfiguration and lighting installation. Los Angeles 07S-LA-101 0.7/1.0 ------------------------------------------------------------- $6,739,000 In the city of Sacramento, on Route 275 over City of the Sacramento River (Tower Bridge). Sacramento Install pedestrian improvements. SACOG Sacramento 03N-Sac-275 0.0/0.1 ------------------------------------------------------------- $7,000,000 Watt Avenue Enhancements. In the county of Sacramento Sacramento, on Watt Avenue from Capital City County Freeway (Route 51) to Jackson Highway (Route SACOG 16). Construct curb, gutter, sidewalks, 03-Sacramento bikeways, lighting, transit shelters, and landscaped medians. ------------------------------------------------------------- $1,020,000 Promenade IV. In the city of Pismo Beach. City of Pismo Construct 525-foot long, 18-foot wide wooden Beach pedestrian walkway connecting Main Street SLOCOG with existing boardwalk adjacent to the 05-San Luis pier. Obispo ------------------------------------------------------------- $1,449,000 Waterfront Boardwalk improvements. In the City of Morro city of Morro Bay, at the waterfront Bay embarcadero near Morro Rock. Construct a SLOCOG pedestrian boardwalk and a bike path. 05-San Luis Obispo ------------------------------------------------------------- $901,000 Maclay Avenue Pedestrian Master Plan. In the City of San city of San Fernando, on Maclay Avenue from Fernando Eight Street to First Street. Construct LACMTA pedestrian improvements. 07-Los Angeles ------------------------------------------------------------- $1,796,000 Pacific Electric Inland Empire Trail. In the City of Rancho city of Rancho Cucamonga along the abandoned Cucamonga Pacific Electric Railroad right of way north SANBAG of Baseline Road. Construct pedestrian and 08-San bicycle paths. Bernardino ------------------------------------------------------------- $375,000 Jack Tone Road Bike Path. Along Jack Tone City of Ripon Road, from the intersection of Jack Tone SJCOG Road and Doak Boulevard to Jack Tone Road 10-San Joaquin and Canal Boulevard. Construct a class I bike Path. ------------------------------------------------------------- $2,000,000 Lake Hodge Bicycle/Pedestrian Bridge. In San San Dieguito Diego County. Construct pedestrian and River Valley bicycle path. Regional Open Space Park, Joint Powers Authority SANDAG 11-San Diego ------------------------------------------------------------- $2,087,000 Multi-Use Beach Trail. In the city of San City of San Clemente, along railroad right of way from Clemente North Beach to Calafia Beach. Construct OCTA Multi-Use Beach Trail. 12-Orange ------------------------------------------------------------- $1,710,000 Streetscape Improvements. In the city of City of Westminster, on Westminster Boulevard from Westminster Beach Boulevard to Bushard Street. OCTA Construct streetscape improvements. 12-Orange ------------------------------------------------------------- $4,900,000 Regional Rideshare Program in Los Angeles Los Angeles County. Metropolitan Transportation Commission LACMTA 07-Los Angeles ------------------------------------------------------------- $3,779,000 Pacific Electric Empire Inland Trail. In San City of Rancho Bernardino County, between Haven Avenue and Cucamonga approximately 100 feet east of Etiwanda SANBAG Avenue. Construct 3 miles of class I multi- 08-San use bicycle, pedestrian and equestrian Bernardino trail. ------------------------------------------------------------- Amount Location County Project Description Dist-Co-Rte Allocation History Postmile ------------------------------------------------------------ $800,000 Near Bridgeville at 1.2 miles east of Van Humboldt Duzen River Bridge #4-284 and at 4.5 miles 01U-Hum-36 east of Van Duzen River Bridge #4-293. 19.24, 28.5 Heavy rain caused the fill slope to fail and undermine the travel way at two locations. This project is needed to buttress the roadway with rock slope protection and repair drainage the travel way. ------------------------------------------------------------ $2,000,000 Near Orleans, 5.2 miles west of Bluff Creek Humboldt Bridge #4-63 to 1 mile east of Slate Creek 01U-Hum-96 Bridget #4-61. On December 30, 2005 23.0/31.0 following a series of storms, a slide occurred at this location. Initial project was needed to remove slide material. First supplemental was needed to remove additional slide material. This supplemental is needed to build a cable net barrier, replace a failing bin wall, extend an existing soldier pile tie back wall, and repair damaged roadway. ------------------------------------------------------------ $400,000 Near Weitchpec, east of Route 169. In March Humboldt 2006, an existing slipout began to expand 01U-Hum-96 affecting the travel way and damaging a 54- 25.17 inch corrugated steel pipe culvert. This project is needed to repair the slipout with a rock buttress, rebuild the failed roadway subgrade, repair the cross-culvert, repair the failed guardrail, and repave the roadway surface. ------------------------------------------------------------ $600,000 Near Myers Flat, one mile south of Eagle Humboldt Point viaduct. In March 2006, an existing 01U-Hum-101 landslide above this highway location began 26.09 to move causing debris to fall on the roadway below. This project is needed to remove unstable fill material, buttress the roadway with rock slope protection, install and repair damaged drainage facilities, and repair the roadway shoulder. ------------------------------------------------------------ $650,000 Near Scotia, 1.8 miles south of Pacific Humboldt Lumber Company Undercrossing. In March 01U-Hum-101 2006, an existing landslide at this 49.19 location began to undermine the roadway causing the travel way to sink. This project is needed to buttress the roadway fill with rock slope protection, fill the void underneath the travel-way, replace a damaged cross culvert, repair damaged guardrail, and repave the roadway surface. ------------------------------------------------------------ $200,000 Near Wauteck, 1.7 miles east of Pecwan Creek Humboldt Bridge. On February 11, 2006, due to heavy 01U-Hum-169 rain, the roadway failed, resulting in the 16.23 loss of a large section of the traveled way. This project removes and disposes of unstable slipout material, and repairs roadway. ------------------------------------------------------------ $2,000,000 Near Lucerne, 0.3 mile east of Verna Way. Lake Rainstorms between January and March 2006 01U-Lak-20 caused a slip out that resulted in roadway 22.18 deformation and pavement cracking. This project is needed to maintain the roadway open to traffic, implement appropriate repair, relocate a sewer main, repair damaged drainage facilities, and pave the roadway. ------------------------------------------------------------ $1,300,000 Near Hopland from 1.0 to 1.2 miles east of Lake Route 101. In March 2006, an existing 01U-Lak-175 slipout began to affect the travel way 1.0/1.2 causing severe roadway deformation. This project is needed to provide continual traffic control, install subsurface drainage facilities, construct a soldier pile retaining wall, replace damaged guard railing, and pave the roadway. ------------------------------------------------------------ $2,000,000 Near Point Arena, 1.2 miles south of Mendocino Schooner Gulch Bridge. On March 7, 2006, 01U-Men-1 an existing slipout, caused by heavy rain, 10.08 began to undermine the traveled way in one location. This project is needed to remove unstable fill material and repair the roadway. ------------------------------------------------------------ $600,000 Near Yorkville, 0.85 mile west of Mountain Mendocino House Road. In March 2006, an existing 01U-Men-128 slipout began to affect the travel way of 47.60 the highway, with the shoulder and portion of the eastbound lane failing and cracks forming along the centerline of the roadway. This project is needed to remove unstable fill material, buttress the roadway with rock slope protection, install subsurface drainage facilities, and repair the traveled way surface. ------------------------------------------------------------ $1,000,000 Near Burnt Ranch, 0.3 mile west of Burnt Trinity Ranch Road. In early January 2006, heavy 02U-Tri-299 rain saturated and destabilized the slope 11.1/11.3 at this location causing debris to fall onto the highway. Initial project was to remove loose material and repair roadway. This supplemental is needed to remove additional loose material, continue traffic control, and roadway repairs. ------------------------------------------------------------ $300,000 Near Placerville at 2 miles east of Ice El Dorado House Road. In March 2006, a slide 03U-ED-50 occurred at this location causing slide 41.7 debris to cover the westbound lane. This project is needed to remove slide material from the highway and from the unstable cut slope. ------------------------------------------------------------ $210,000 Near Winters at 0.3 mile west of County Road Yolo 86. Due to the storms of late 2005 and 03U-Yol-128 early 2006, a slipout occurred at this 4.25 location in March 2006 causing the closure of the eastbound lane. This project is needed to reconstruct the embankment, replace a damaged culvert and repair the eastbound lane. ------------------------------------------------------------ $2,000,000 In San Pablo between San Pablo Dam Road and Contra Costa El Portal Drive. Due to heavy rain in 04U-CC-80 early January 2006, a large landslide 4.7 developed and damaged an existing retaining wall. This project removes the slide debris and replaces the retaining wall with a geogrid-reinforced wall. ------------------------------------------------------------ $300,000 Near Muir Beach approximately 1.8 miles Marin north of Muir Woods Road. In January 2006, 04U-Mrn-1 rainstorms caused a roadway slipout on the 7.7 southbound lane. This project is needed to rebuild the damaged roadway and restore embankment using rock slope protection. ------------------------------------------------------------ $1,000,000 Near Calistoga at 2 miles north of Garnett Napa Creek. In March 2006, heavy rainstorms 04U-Nap-29 caused a landslide to occur on the cut 41.17 slopes near Mt. St. Helena and resulted in a roadway closure. This project is needed to grade the slope and remove the slide material. ------------------------------------------------------------ $750,000 Near Sky Londa approximately 3 miles south San Mateo of Route 35. Rainstorms in January and 04U-SM-84 March 2006 caused roadway slipouts at two 11.5/11.9 locations. This project is needed to grind and repave traveled way, reset guardrail, replace culvert, and setup one-way traffic control. ------------------------------------------------------------ $150,000 Near Saratoga approximately 0.8 mile north Santa Clara of SR 35. As a result of heavy rain in 04U-SCl-9 late 2005 and early 2006, a cut slope 0.8 failed at this location and slide material began to fall on the highway below. This project is needed to install rock drapery and a soil nail wall. ------------------------------------------------------------ $1,000,000 In Jenner at Jenner Street. As a result of Sonoma heavy rain in late 2005 and early 2006, a 04U-Son-1 slope failure developed on the hillside 22.08 below the roadway. The slope failure continued to expand, and threaten to undermine the highway pavement. This project is needed to remove the slide debris and construct a soldier pile retaining wall. ------------------------------------------------------------ $1,200,000 Near Fort Ross approximately at 0.5 mile and Sonoma at 4 miles south of Fort Ross Road. As a 04U-Son-1 result of heavy winter rain in late 29.15, 32.44 December 2005 and early January 2006, slope failures developed on the hillside below the roadway at two locations. This project is needed to remove the slide debris and construct a retaining structure (PM 29.15) and rock slope protection (PM 32.44). ------------------------------------------------------------ $24,500,000 Near Geyserville, at the Russian River Sonoma Bridge. Storms in late December 2005 and 04U-Son-128 early January 2006 damaged the bridge piers 5.3/5.8 and caused closure of the bridge. This project is needed to replace the bridge, build approaches to the new bridge, and maintain traffic. ------------------------------------------------------------ $400,000 Near Del Rey Oaks at Del Ray Gardens Drive. Monterey On April 5, 2006, a sinkhole appeared 05U-Mon-218 adjacent to the roadway over an existing 1.53 84-inch corrugated metal pipe culvert. The failed culvert and sinkhole can undermine the highway and adjacent private property. This project is needed to repair or replace the culvert as necessary, reconstruct the slopes and conduct necessary traffic control. ------------------------------------------------------------ $375,000 In Santa Barbara at Castillo Street. The Santa Barbara storms of late 2004 and early 2005 caused 05U-SB-101 the pavers at this location to sink due to 14.9 rising groundwater and form uneven pavement surface for motorists and bicyclists. Initial project replaced the pavers with a floating concrete slab. This supplemental allocation is needed to close out the contract. ------------------------------------------------------------ $600,000 Near Watsonville at Larkin Valley Road. On Santa Cruz April 5, 2006, continued rain, and a 05U-SCr-1 failing 84-inch culvert caused a slipout at 7.7 the northbound onramp. This project is needed to repair the failed culvert, reconstruct the failed roadway prism, and repave the highway. ------------------------------------------------------------ $285,000 In Moorpark City on the eastbound 118 Ventura transition to southbound Route 23 (Bridge # 07U-Ven-118 51-0123). Bridge inspection revealed a 18.68 section of structural steel I-beam within a joint assembly has failed. This project is needed to replace the complete bridge joint assembly before it experiences total collapse. ------------------------------------------------------------ $300,000 Near Barstow at Mustang Wash Bridge (# 54- San Bernardino 0893R). Bridge inspection in early 2006 08U-SBd-40 revealed that three girders on Span 2 near 97.6 Abutment 3 have severe cracking and bridge deck has separated from girders. This project is needed to install temporary shoring under the bridge to prevent it from collapsing. ------------------------------------------------------------ $1,000,000 Near Moccasin at 0.6 mile east of Moccasin Tuolumne Creek Bridge. Due to repeated rainstorms 10U-Tuo-120 in March and April 2006, an existing 84- T24.76 inch culvert failed causing a sinkhole in both highway lanes. This project is needed to replace the failed culvert, place rock slope protection, construct a headwall and reconstruct the roadway. ------------------------------------------------------------ $50,000 In the City of Orange, north of Lincoln Orange Avenue. Initial allocation was to repair 12U-Ora-55 slope failed due to heavy rain in January 16.7 and February 2005. The first supplemental was needed due to delays caused by the use of special geogrid design and work on narrow steep slope next to live traffic. This supplemental is needed to make final payment and close out the contract. ------------------------------------------------------------ $802,000 In Goleta at Hollister Avenue overcrossing Santa Barbara (Bridge # 51-0123). This seismic retrofit 05B-SB-101 project adds concrete encasement to each 26.9 existing column and constructs shear walls and concrete footings. ------------------------------------------------------------- $2,363,000 Near Marysville, at Noble Road to Woodruff Lane. Add shoulder and two-way turn lane. Yuba 03N-Yub-70 18.9/20.0 ------------------------------------------------------------- $1,174,000 Near Kettleman City, north of county line to Waterloo Avenue. Construct median barrier. Kings 06N-Kin-5 3.3/7.0 ------------------------------------------------------------- $1,138,000 Near Goshen-Avenue 328 to Cross Creek Bridge. Install thrie-beam median barrier. Tulare 06S-Tul-99 43.4/45.7 ------------------------------------------------------------- $3,608,000 In Barstow, from Muriel Ave to East Yermo Road. Regrade median and install median San Bernardino barrier. 08S-SBd-15 74.1/R86.4 ------------------------------------------------------------- $13,403,000 Near Lodi, from Eight Mile Road overcrossing to South Lodi overcrossing. Install median San Joaquin barrier. 10N-SJ-99 25.4/29.0 ------------------------------------------------------------- CTC Financial Vote List June 7-8, 2006 ---------------------------------------------------------------------- 2.6 Mass Transportation Financial Matters ------------------------------------------------------------ Project Title Allocation Amount Location Recipient Project Description RTPA/CTC Project Funding District-County ------------------------------------------------------------ $2,500,000 Sacramento/West Sacramento Streetcar Yolo County Alternative analysis and EIR/EIS work for Transportation li


Source: Business Wire

More News in this Category


Related Articles



Rating: 4.0 / 5 (4 votes)
Rate this article:
1/52/53/54/55/5

User Comments (0)

Comment on this article

Your Name
Text from the image
Comment
max 1200 chars
* All fields are required