EPA Proposes Cleanup Plan for Two Creeks Near Nease Superfund Site
Posted on: Friday, 11 July 2008, 12:00 CDT
CHICAGO, July 11 /PRNewswire-USNewswire/ -- U.S. Environmental Protection Agency Region 5 recently completed a study and proposed a plan to clean up mirex-contaminated soil and sediment in two creeks near the Nease Chemical Superfund site in Columbiana County, Ohio. A public comment period begins July 14 and continues until Aug. 13. A public meeting will be held at 6:30 p.m., July 31, at Salem Public Library, 821 E. State St.
After reviewing a feasibility study prepared by responsible party Rutgers Organics Corp., EPA evaluated three cleanup alternatives. The agency proposes a $3.8 million plan that includes:
-- Removal of the most contaminated sediment in the Middle Fork of Little Beaver Creek
-- Removal of Feeder Creek sediment -- Removal of the most contaminated floodplain surface soil-- Disposal of contaminated soil and sediment at the former Nease facility, where it will be covered with clean soil.
EPA considers this proposed plan protective of human health and the environment. It will provide long-term effectiveness and is cost-effective.
Comments will be accepted at the July 31 meeting or online via http://www.epa.gov/region5/sites/nease. Background information including a current fact sheet is posted at that URL and available for review at the Salem Public Library and the Lepper Library, 303 E. Lincoln Way, Lisbon. Residents who need special accommodations for the meeting may contact Community Involvement Coordinator Susan Pastor by July 24 at 800-621-8431, Ext. 31325, or pastor.susan@epa.gov.
EPA will choose a final cleanup plan after reviewing all comments received during the comment period. The agency may modify its proposed plan or select another of the options outlined at the public meeting or in the fact sheet posted at the Web site.
The Nease Chemical Co. operated from 1961 to 1973, producing household cleaning products, fire retardants and pesticides -- some using an uncommon chemical called mirex. Unlined ponds were used to treat chemical waste, which seeped into the area's soil and ground water. The Superfund site consists of 44 acres along state Route 14, 2.5 miles northwest of Salem on the Columbiana-Mahoning county line. Rutgers Organics, based in Germany, acquired the property in 1977, but never operated there. The site was placed on the Superfund National Priorities List in 1983.
Separate from the work outlined in this proposed cleanup plan, EPA approved a cleanup plan in 2006 to address the portion of the site known as Operable Unit 2. Ground water and mirex-contaminated soil cleanup work for this portion of the site of the site is under way and is expected to continue through 2011.
U.S. Environmental Protection Agency Region 5
CONTACT: Mick Hans, +1-312-353-5050, hans.mick@epa.gov, or Susan Pastor,+1-312-353-1325, pastor.susan@epa.gov, both of U.S. Environmental ProtectionAgency Region 5
Source: PRNewswire-USNewswire
Related Articles
- Travel Planning Site GeckoGo.com Joins Forces With Award Winning Travel Guide Publisher Bradt Travel Guides
- Center'D Launches the First Local Planning Site That Integrates Local Search, Planning Tools and Social Networking
- EPA Meetings on South Minneapolis Soil Contamination In October and November
- EPA Update Meeting on South Minneapolis Arsenic Site Nov. 28, Community Advisory Group Organizational Meeting Dec. 12
- EPA To Celebrate National Superfund Cleanup Milestone at Macalloy Corporation Site in North Charleston, SC
- EPA Schedules Three Neighborhood Meetings for South Minneapolis Soil Contamination Site
- Critics Decry EPA's Plan Relaxing Toxic-Release Rules
- DOE Plant Site Gets New Cleanup Firm: Shaw Environmental And Infrastructure And Portage Environmental Will Replace Bechtel Jacobs At The Paducah Gaseous Diffusion Plant.
- EPA Seeking Comment on Contamination Study
- Quaero CEO to Reveal How Successful Marketers Earn & Keep Their Seat at the Executive Table During CRMA-Atlanta's July 19th Meeting
User Comments (0)

RSS Feeds