East Water Denies Cuts
Posted on: Saturday, 20 August 2005, 00:00 CDT
Aug. 19--Eastern Water Resources Development and Management Plc insists it has not reduced supplies to Rayong and is still delivering the normal amount of 20,000 cubic metres of water per day to the local Provincial Waterworks Authority unit.
East Water chief executive Wanchai Lawatanatrakul was responding to complaints that the company had cut supplies to the PWA for general use in order to reserve more water for industrial activities.
Mr Wanchai said technical tests on a pump system and water allocation from the Rayong River earlier this month might have affected pressure and generated air blockages that impeded normal water flows through the pipeline system.
As a result, the PWA's Ban Chang station might have received less than the 20,000 cubic metres of water that entered the pipeline system, he said.
The problem has been solved and PWA officials in Ban Chang confirmed volumes were normal as of Tuesday, he added.
Mr Wanchai added that East Water was now acquiring supplementary water supplies of 150,000 cubic metres per day from the Rayong River and Bang Pra reservoir as a result of the recent investment of 440 million baht in new pipelines.
East Water also has invested 10 million baht to connect its pipeline system with the Nong Plalai reservoir, one of two key reservoirs in the Eastern Seaboard area.
The additional water from the Rayong River and Bang Pra reservoir would help increase the available supply from the Nong Plalai and Dok Krai reservoirs in Rayong from 300,000 to 450,000 cubic metres per day, said Mr Wanchai.
-----
To see more of the Bangkok Post, or to subscribe to the newspaper, go to http://www.bangkokpost.com.
Copyright (c) 2005, Bangkok Post, Thailand
Distributed by Knight Ridder/Tribune Business News.
For information on republishing this content, contact us at (800) 661-2511 (U.S.), (213) 237-4914 (worldwide), fax (213) 237-6515, or e-mail reprints@krtinfo.com.
Source: Bangkok Post
Related Articles
- Far East Energy Production Increases to Over 500,000 Cubic Feet Per Day
- Marioff HI-FOG(R) Water Mist Fire Protection System Receives Waterwise Recognition Award
- BARWA and Qatari Diar Develops the First Performance-Based Sustainability Rating System in the Middle East
- China Selects GE Oil & Gas Compression Technology for Second West-to-East Pipeline Project
- NuStar to Build Additional 12.5-Mile Segment of East Pipeline System
- Kidneys And Genito-Urinary System - Benign Prostatic Hyperplasia Drug Pipeline Report Provides Detail On The Top 20 Companies With Products In The Early And Late Stage Of Development
- Aquacell Water Provides Arsenic Removal Systems to the Navajo Nation
- Allegiance Equity Corporation: Private Placement of Up to 2,000,000 Common Shares at $0.25 Per Share
- Toreador Provides Operational Update; Akcakoca-3 Well Flow Tests 18 Million Cubic Feet of Gas Per Day From One Zone
- HydroFlo Water Treatment Plus(TM) System Provides Accelerated ROI
User Comments (0)

RSS Feeds