White Knight Extends Gold Mineralization at Gold Pick Property, Nevada
Posted on: Friday, 25 November 2005, 12:00 CST
White Knight Resources Ltd. (TSX VENTURE:WKR) (the "Company") has received assay results from the Phase I drilling program at its wholly owned Gold Pick property. The drill program resulted in the significant extension of the existing gold mineralization. Gold Pick is located in the Gold Bar mining district in central Nevada, approximately 30 miles (49km) northwest of Eureka.
A total of 5,430 feet (1,655m) of RC drilling was conducted in 10 drill holes. The drilling was designed to test for extensions of feeder structures beyond the design limits of the Gold Pick open-pit mine. The drilling significantly extended both the southwest and northwest feeder zones, with five of the ten holes encountering strong mineralization. Highlights include hole GPQ-6, which intersected 30 feet (9.1m) grading 0.062 oz/ton (2.112 g/t) gold including a 5-foot (1.5m) interval of 0.230 oz/ton (7.88 g/t) gold; and hole GPQ-9, which drilled 25 ft (7.6m) grading 0.143 oz/ton (4.907 g/t) gold, including a 5-foot (1.5m) intercept of 0.226 oz/ton (9.840 g/t) gold. Complete drilling results using a 0.010 oz/ton (0.342 g/t) gold cut-off are shown in the table below.
-------------------------------------------------------------------- Hole Zone TD (ft) Thickness (ft) Au (opt) Au (g/t) from (ft) to (ft) -------------------------------------------------------------------- GPQ-1 SW 480 45 0.037 1.255 310 355 25 0.052 1.788 380 405 with 5 0.172 5.898 395 400 10 0.016 0.565 435 445 -------------------------------------------------------------------- GPQ-2 SW NSV -------------------------------------------------------------------- GPQ-3 SW 540 65 0.018 0.611 450 515 -------------------------------------------------------------------- GPQ-4 SW 720 15 0.014 0.480 570 575 5 0.011 0.380 600 605 15 0.014 0.466 615 625 10 0.017 0.576 645 655 5 0.011 0.373 660 665 5 0.012 0.402 705 710 -------------------------------------------------------------------- GPQ-5 SW 700 NSV -------------------------------------------------------------------- GPQ-6 SW 740 30 0.062 2.112 515 545 with 5 0.230 7.880 520 525 -------------------------------------------------------------------- GPQ-7 SW 600 NSV GPQ-8 NW 450 80 0.027 0.942 355 435 with 20 0.047 1.601 410 430 -------------------------------------------------------------------- GPQ-9 NW 600 25 0.143 4.907 225 250 with 15 0.226 9.840 230 235 20 0.020 0.689 5 0.040 1.374 400 410 5 0.015 0.342 435 440 -------------------------------------------------------------------- GPQ-10 NW 600 NSV -------------------------------------------------------------------- True widths are unknown
Atlas Precious Metals Inc. mined approximately 70,000 oz gold from the Gold Pick open-pit mine in the mid 1990's. At the time of mine closure in 1995, a historical resource of approximately 285,000 oz gold (5.00 million tons at 0.057 oz/ton gold, assuming a gold price of $500/oz) was estimated to remain in the mine plan designed by Mine Development Associates of Sparks, NV. This historical resource estimate was completed prior to implementation of NI 43-101 and has not been re-defined to conform to CIM approved standards as defined by NI 43-101. This resource estimate has been obtained from sources believed to be reliable and is relevant. The Company is not treating this historical estimate as a NI 43-101 defined resource or reserve verified by a Qualified Person. Until such time as the Company is able to verify and classify this historic resource according to CIM standards, it should not be relied upon.
Hole GPQ-6 was located about 600 feet (180m) southwest of the ultimate pit design limit, and 230 feet (70m) from the nearest known mineralization. There is no drilling to the southwest of hole GPQ-6, leaving the feeder zone of the Gold Pick East deposit completely open to the southwest. Hole GPQ-9 was drilled about 250 feet (76m) northwest of the pit limit and has discovered the northwest extension of the high-grade feeder structure for the Gold Pick West deposit.
The Company plans to move a drill rig back to the property in late November to commence the Phase II drilling program, which will test the northeast extension of the Gold Pick East deposit and will further test the southwest extension zone, if weather conditions allow.
Quality Control
The Company employs a Quality Control program consisting of re-assaying of both mineralized (greater than 0.010 oz/ton gold) and randomly selected coarse reject samples, insertion of coarse standard samples, and assaying of both random and mineralized duplicate drilling samples though an umpire laboratory (BSI Inspectorate of Sparks, NV). Drill-cuttings samples were bagged, sealed and shipped directly to American Assay Laboratories in Elko, Nevada for sample preparation, then to Sparks, Nevada for analysis. All samples were analyzed for gold and silver by fire-assay technique.
About the Company
White Knight is an exploration company active in finding and exploring mineral prospects. The Company has been exploring Nevada since 1993 and currently controls the second largest land holding in the Cortez Trend. Its property portfolio includes 18 properties (over 60,000 acres), sixteen of which are located in the Cortez Trend. The 2005 exploration season is very active for the Company as the total anticipated drilling exposure during the 2005 field season is expected to be approximately 70,000 feet.
This news release was reviewed and the contents have been verified by the Company's Qualified Person, John M. Leask, P.Eng.
On behalf of the Board of Directors,
John M. Leask, P.Eng., Chairman of the Board
The TSX Venture Exchange does not accept responsibility for the ad equacy or accuracy of this release.
White Knight Resources Ltd. (TSX VENTURE:WKR)
Source: Business Wire
Related Articles
- Patriot Gold Announces Drilling Results for Moss Mine Project, Arizona
- Patriot Gold Announces Drilling Results for Bruner Project, Nevada
- Breaking a World Record: CNX Gas Drills Over 15,000 Feet to Take Top Honors
- Andina Reports Volcan Gold Project Drill Results From the Ojo De Agua Area
- Ventura Gold Commences Drilling at Inmaculada Gold Project in Peru
- Meridian Gold Commences Drilling Atna's Clover Project
- Freegold Drilling Intersects 28.5 G/T Over 9 Feet On Golden Summit Tolovana Vein
- Jet Gold Naskeena Drilling Update
- Gold Resource Corporation Announces Continued High-Grade Drill Intercepts, Including 49 Feet of 0.20 Oz/Ton Gold Equivalent at El Aguila Project, Mexico
- Paramount Gold's First Drill Results Include Bonanza Gold Grade of 35.5 G/T Gold Over 4 Meters at San Miguel Project in Mexico
User Comments (0)

RSS Feeds