NASA to Speed Up Shuttle Launch Schedule
Posted on: Sunday, 6 January 2008, 12:00 CST
NASA officials in Washington plan to double the number of shuttle flights to hasten the completion of the International Space Station amid safety concerns.
The National Aeronautics and Space Administration said it has scheduled six shuttle launches for 2008, twice that of the previous two years, in an effort to complete the assembly of the International Space Station even though there are concerns about the durability and safety of the 27-year-old shuttle fleet, The Washington Post said Sunday.
Recurring electrical problems grounded the space shuttle Atlantis in December, and budgetary, political and maintenance considerations may tempt the fate of future missions.
NASA officials said they're confident the spaceships can complete the work load by the time they are to be retired in September 2010, but critics worry the ambitious schedule may be at the cost of safety.
This pressure feels so familiar, said Alex Roland, a former NASA historian with Duke University. It was the same before the Challenger and Columbia disasters: this push to do more with a spaceship that is inherently unpredictable because it is so complex.
NASA officials said the next mission has a tentative launch date of Jan. 24.
Source: United Press International
Related Articles
- NASA Gives 'Go' for Space Shuttle Discovery Launch on Aug. 25
- NASA Sets Space Shuttle Launch for August 27
- Space shuttle Discovery nears space station
- NASA assessing space shuttle foam flaw
- Latest space shuttle mishap prompts warning
- NASA Orders More Space Shuttle Fuel Tank Fixes
- NASA Space Shuttle Motor Test Successful
- NASA Set to Revamp System, Change Space Shuttle Operation, Management
- NASA Assures Board It Will Follow Directives on Space-Shuttle Safety
- NASA Shakes Up Space Shuttle Program
User Comments (0)

RSS Feeds