Quantcast

Latest PPL Susquehanna LLC Stories

2011-08-19 13:01:00

BERWICK, Pa., Aug. 19, 2011 /PRNewswire/ -- The Unit 2 reactor at PPL's Susquehanna nuclear power plant in northeastern Pennsylvania shut down automatically at 10:46 a.m. Friday (8/19). The unit was operating at full power at the time. The shutdown occurred during scheduled, routine equipment surveillance; the cause is under investigation. "The reactor shut down safely. All plant systems are operating as designed," said Timothy S. Rausch, senior vice president and chief nuclear officer...

2011-06-07 13:10:00

BERWICK, Pa., June 7, 2011 /PRNewswire/ -- A thorough inspection of the Unit 1 main turbine at the PPL Susquehanna nuclear power plant in northeastern Pennsylvania has revealed blade damage similar to that discovered during a recent routine inspection of the plant's Unit 2 main turbine. "The scope of the turbine blade damage on Unit 1 is virtually identical to what we discovered on Unit 2," said Timothy S. Rausch, PPL's chief nuclear officer. The main turbine for each unit at the...


Word of the Day
barratry
  • The offense of persistently instigating lawsuits, typically groundless ones.
  • An unlawful breach of duty on the part of a ship's master or crew resulting in injury to the ship's owner.
  • Sale or purchase of positions in church or state.
This word ultimately comes from the Old French word 'barater,' to cheat.
Related