Latest Twin Metals Minnesota LLC Stories
TORONTO, Oct. 1, 2012 /PRNewswire/ - Duluth Metals Limited ("Duluth Metals" or the "Company") (TSX: DM) (TSX: DM.U) is pleased to announce that it has closed a US$10,000,000 loan financing with Antofagasta Minerals S.A. (a subsidiary of Antofagasta plc) pursuant to the terms of a participation agreement (the "Participation Agreement") relating to the Twin Metals Minnesota LLC joint venture (the "Joint Venture"). The loan proceeds have been invested in the Joint Venture as the...
TORONTO, July 30, 2012 /PRNewswire/ - Duluth Metals Limited ("Duluth") (TSX: DM) (TSX:DM.U) today announces that the independent NI 43-101 Technical Report completed by AMEC E&C Services Inc. (AMEC) with a team led by Dr. Harry Parker entitled "Maturi, Birch Lake, and Spruce Road Cu-Ni-PGE Projects, Ely, Minnesota, USA, NI 43-101 Technical Report" with an effective date of June 15, 2012 has now been filed on Sedar (www.sedar.com). This filing follows the Duluth press release of...
-- Amongst the world's largest Cu-Ni-PGM polymetallic sulphide deposits with contained metals (using a 0.3% Cu cut-off) of Indicated 8.0 Billion lbs copper, 2.5 Billion lbs nickel, and 12.1 Million ozs palladium+platinum+gold (TPM)1and Inferred 13.5 Billion lbs copper, 4.6 Billion lbs nickel, and 15.8 Million ozs TPM 1. -- Using a base case 0.3% Cu cut-off, AMEC estimated Indicated Resource of 726...
TORONTO, June 12, 2012 /PRNewswire/ - Duluth Metals Limited ("Duluth Metals") (TSX: DM) (TSX: DM.U) will be issuing a press release at 6:30am EST June 13, 2012 related to a new draft NI 43-101 Technical Report on the consolidated mineral resources for the Twin Metals Minnesota Project in Northeastern Minnesota prepared by AMEC E&C Services Inc. An analyst/investor conference call has been scheduled for June 13, 2012 at 10:00am EST with contact details contained in the press...
TORONTO, June 4, 2012 /PRNewswire/ - Duluth Metals Limited ("Duluth Metals") (TSX: DM) (TSX:DM.U) is pleased to announce that the Duluth Metals Annual and Special Meeting of Shareholders will be held at the Royal York Hotel, Library Room, Main Mezzanine Level, 100 Front St. West, Toronto, on Thursday, June 14, 2012 at 10:00am EST. An archived copy of the presentation will also be available on the Company website at www.duluthmetals.com after the meeting. The meeting will include...
-- Drill results of additional 32 holes in the Maturi Deposit -- Drilling in the western part of the Maturi Deposit confirms the continuity of the resource with a number of intersections returning good grade over significant widths -- The imminent interim resource estimate prepared by AMEC in compliance with the requirements of NI 43-101 on the consolidated mineral resource of the Twin Metals Minnesota...
-- Nokomis and Maturi deposits will be consolidated due to geologic continuity and referred to as the "Maturi Deposit" -- Drilling indicates continuity between these two deposits -- Good assay results amongst 30 holes at the Twin Metals Minnesota Project with strong Total Precious Metals values -- Maturi Deposit shows good grades and widths -- Pre-Feasibility study in progress on Twin Metals Minnesota...
-- Continued positive drill results in between the Maturi and Nokomis Deposits -- Results continuing to show higher grade PGM assays in the area of the "donut hole" -- Pre-Feasibility study in progress on Twin Metals Project -- The initial pre-feasibility NI-43-101 Resource Estimate report on the consolidated resources of the Twin Metals Project is nearing completion by AMEC -- Bechtel is...
TORONTO, March 21, 2012 /PRNewswire/ - Duluth Metals Limited ("Duluth Metals") (TSX: DM) (TSX: DM.U) is pleased to announce that Twin Metals Minnesota LLC has instructed Bechtel Engineering to prepare the NI-43-101 Pre-Feasibility Study on the Twin Metals Project based on the following parameters: -- A vertically integrated mining complex; -- Large scale phased underground mine plan and development; -- Evaluating different scenarios respecting both...
In TO246 disseminated today at 07:00 ET, an error occurred in the headline. The headline should now read "Duluth Metals Announces 40 feet of 2.268 g/t Total Precious Metals on Latest Drilling at the Twin Metals Project" not "Duluth Metals Announces 40 feet of 2.67 g/t Total Precious Metals on Latest Drilling at the Twin Metals Project". Corrected copy follows: Duluth Metals Announces 40 feet of 2.268 g/t Total Precious Metals on Latest Drilling at the Twin Metals Project...
