Quantcast

Latest Westar Stories

2008-09-02 09:00:36

Westar Energy, which is engaged in power generation, transmission and distribution, has announced that it will build a 115kV high-capacity transmission line near Atchison, Kansas. The new line is part of Westar Energy's agreement to support the TransCanada's Keystone Pipeline.

2008-08-29 15:00:48

The Westar Energy, Inc. (NYSE: WR) Board of Directors today declared a quarterly dividend of 29 cents per share payable Oct. 1, 2008, on the company's common stock.

2008-08-27 09:01:20

Westar Energy has announced that it will conduct an open house on September 2, 2008, in Seneca, Kansas, to meet with residents near the possible routes of a 115kV, high-capacity transmission line that will be built in the area.

2008-08-02 03:00:15

By Dan Margolies, The Kansas City Star, Mo. Aug. 2--A federal judge has refused to dismiss indictments against former Westar Energy executives David Wittig and Douglas Lake, setting the stage for their retrial on conspiracy and other charges. U.S.

2008-07-21 18:00:41

On Aug. 8, 2008, Westar Energy, Inc. (NYSE: WR) will release second-quarter 2008 earnings before market open. Bill Moore, Westar Energy president and chief executive officer, will host a conference call and audio Webcast at 10 a.m. Eastern Time (9 a.m. Central).

2008-06-25 06:03:16

Westar Energy and BP Alternative Energy North America have broken ground at the Flat Ridge wind farm site, located about 60 miles southwest of Wichita, Kansas. The Flat Ridge wind farm is a 100MW project developed by BP.

2008-06-24 12:03:03

The Capital-Journal Westar Energy, Inc. and BP Alternative Energy North America Inc. will conduct a ground-breaking ceremony starting at noon today at the Flat Ridge Wind Farm site in Barber County about 60 miles southwest of Wichita. Flat Ridge Wind Farm is a 100-megawatt project developed by BP.

2008-06-19 15:00:33

Westar Energy (NYSE: WR) and Renewable Energy Systems Americas (RES) will conduct a ground-breaking ceremony at 10:30 a.m. Friday, June 20 at the Central Plains Wind Farm site, 229 N. CR 23, Marienthal, KS, 67863.

2007-06-22 09:14:11

Terax Energy (OTCBB: TEXG) announced today that its has finalized the agreements for the following to occur with Westar Oil: A share exchange which includes a change in name from Terax Energy, Inc. to Westar Oil and Gas Inc, and the acquisition of $175 Million in senior debt.

2007-02-07 18:00:32

Westar Oil Inc. has completed its initial testing of its Railroad Valley property. As a result from that testing and other considerations, the Company announces its plans to become a public company. It is expected that the shares are to be valued between $15.00 to $20.00 dollars per share.


Latest Westar Reference Libraries

sts-51a
2012-03-10 08:40:54

Discovery launched from Kennedy Space Center on November 8, 1984 at 7:15 AM EST and landed at Kennedy on November 16 at 6:59 AM EST. The shuttle orbited 127 times at an altitude of 185 nautical miles at an angle of 28.5 degrees and travelled 3.3 million miles. The mission lasted 7 days, 23 hours, 44 minutes, and 56 seconds. The Canadian communications satellite TELESAT-H (ANIK), attached to Payload Assist Module-D (PAM-D) was deployed into geosynchronous orbit on flight day two. On the...

STS-41B
2012-03-10 08:29:30

Challenger launched from Kennedy Space Center on February 3, 1884 at 8:00 PM EST and landed at Kennedy Space Center on February 11, 1984 at 7:15 AM EST. The shuttle orbited 128 times at an altitude of 189 nautical miles, at an inclination of 28.5 degrees, and travelled 3.3 million miles. The mission lasted 7 days, 23 hours, 15 minutes, and 55 seconds. The highlights of the mission were the first untethered space walks were made by McCandless and Stewart using a manned maneuvering unit. In...

More Articles (2 articles) »
Word of the Day
plim
  • To swell, as grain or wood with water.
The word 'plim' is probably a variant of the word 'plum'.
Related